Opportunity

Spokane Procureware #RFQu 6654-26

Spokane Water Model Calibration and Simulation Services

Posted

November 24, 2026

Respond By

January 05, 2027

Identifier

RFQu 6654-26

NAICS

541620

The City of Spokane is seeking a qualified firm to update and calibrate its water-system hydraulic model and develop operational and future-condition simulations. - Government buyer: City of Spokane, Integrated Capital Management Department. - OEM: Autodesk Inc., whose InfoWater Pro software is the platform used for the existing model. - Requested services: Review the existing model and prior calibration report; collect and verify field, SCADA, GIS, meter, pressure, tank-level, flow, and operator data; update model and infrastructure inputs; and review pump data, controls, pump curves, and pressure-reducing valve settings and curves. - Modeling and deliverables: Calibrate winter and summer conditions for steady-state and extended simulations; develop current and future scenarios, including 20- and 50-year projections and hydrant fire-flow modeling; assess indications of significant water loss; and provide the calibrated model and a report documenting methods, assumptions, results, KPIs, scenarios, and recommendations. Extended simulations should run for at least 24 hours, preferably 48 hours or longer. - Optional work: Review data-control processes and recommend steps to integrate SCADA, AMI, and GIS data toward a future digital-twin model. - Notable requirements: Deliverables must comply with ADA Title II and WCAG 2.1. The firm and project leads must each have at least five years of water-model calibration experience using Autodesk InfoWater Pro, and the firm must be licensed to do business in Washington. - Items and quantities: No separately priced products, part numbers, or fixed service quantities are specified.

Description

The City of Spokane seeks qualifications from firms to update and calibrate its existing Autodesk InfoWater Pro hydraulic water model. Work includes field testing and verification, data collection and analysis, model updates, calibration for winter and summer conditions, and development of steady-state and extended simulations. The scope also includes a calibration report and related scenario development, with an optional task to review data-control processes and recommend steps toward integrating SCADA, AMI, and GIS data. Proposals must be submitted electronically through the City’s ProcureWare portal by January 5, 2027, at 11:00 a.m.

View original listing