The City of Lebanon, Oregon, is seeking a contractor to rebuild North Fifth Street and improve its stormwater, sewer, and water infrastructure. - Buyer: City of Lebanon, Oregon; no sub-agency or procurement office is identified. - Scope: Reconstruct North Fifth Street between Tangent Street and Mary Street, including roadway and pedestrian improvements, utility upgrades, traffic control, restoration, and related work in state highway and railroad rights-of-way. - Construction quantities: Remove about 5,800 square yards of existing street, sidewalk, and driveway surfaces; install about 1,700 feet of curbing and 1,800 feet of curb and gutter; excavate about 3,600 cubic yards; place 4,300 tons of aggregate base and 1,700 tons of Level 3, 1/2-inch asphalt concrete pavement; build about 8,600 square feet of driveways and sidewalks and six ADA ramps; install about 5,000 feet of pavement and curb markings and legends. - Stormwater: About 500 feet of 6- to 12-inch pipe, four shallow manholes, and five curb inlets. - Sanitary sewer: About 370 feet of 12-inch PVC pipe, one 60-inch manhole, 90 feet of 30-inch CIPP lining, 113 square feet of structural composite manhole liner, and video inspections of mains and service lines. - Potable water: About 1,700 feet of 6- to 16-inch ductile iron water line with valves and fittings; 90 feet of 18-inch steel bore casing; four fire hydrant assemblies; 500 feet of PEX service line; and 19 service connections. - OEMs and vendors: None are named; no manufacturer-specific products or part numbers are specified. - Notable requirements: Includes mobilization, temporary work-zone traffic control, permitting, site restoration, and incidental work needed to complete construction.
Description
The City of Lebanon is soliciting construction work to reconstruct North Fifth Street between Tangent Street and Mary Street. Work includes removing existing street, sidewalk, and driveway surfaces; roadway, curb, and sidewalk improvements; and stormwater, sanitary sewer, and potable water system improvements. The project also includes traffic control, site restoration, permitting, and work within state highway and railroad rights-of-way. The source lists a bid deadline of January 12, 2027, at 9:00 AM PST.