Opportunity
City of Laredo Ionwave #FY26-ENG-67 Addendum 1
Laredo seeks roof and ceiling replacement at Colombia Solidarity Bridge No. 3
Posted
November 16, 2026
Respond By
December 10, 2026
Identifier
FY26-ENG-67 Addendum 1
NAICS
238160, 238310
The City of Laredo is seeking a contractor to replace the roof and water-damaged interior ceilings at its Colombia Solidarity Bridge No. 3 office building. - Government buyer: City of Laredo, Engineering Department; the City Secretary’s Office is also identified in the bid notice. - Opportunity: FY26-ENG-67, Colombia Solidarity Bridge No. 3 Office Building – Roof Maintenance. - Requested work and materials: - Replace approximately 5,000 square feet of roofing with a complete commercial-grade 60-mil TPO system. - Provide compatible polyisocyanurate insulation, roof-deck and substrate repairs, drainage work, flashing, and related roofing accessories. - Replace approximately 7,500 square feet of commercial-grade 2-by-4-foot ceiling tiles, damaged grid components, and interior fiber insulation. - Remove existing materials, protect the building from weather, complete cleanup, and provide project closeout documentation. - OEMs and vendors: No specific manufacturers, OEMs, or vendors are named. Bidders must identify their proposed roofing-system manufacturer and products for review. - Notable requirements: The TPO system is generally to be fully adhered, with heat-welded seams and a watertight completed installation. Roofing and ceiling workmanship warranties are specified at a minimum of five years and one year, respectively. A $35,000 City-controlled contingency allowance is included; BABAA applies to structural and reinforcement steel. - Performance period: 150 working days; work is to begin within ten days after the written notice to proceed.
Description
The City of Laredo seeks bids to remove and replace the existing TPO roofing system at the Colombia Solidarity Bridge No. 3 Office Building and correct roof conditions contributing to water intrusion. Work also includes replacing water-damaged suspended ceiling tiles and associated damaged ceiling-grid components in affected areas. The scope includes roof deck and insulation work, flashing and drainage integration, interior ceiling work, and related project closeout requirements. The stated construction contract period is 150 working days.