Opportunity

Rockford Civic Plus #1026-FD-099

Rockford Fire Station #1 Building Renovation and Alterations

Posted

November 04, 2026

Respond By

December 07, 2026

Identifier

1026-FD-099

NAICS

238290, 238190

The City of Rockford is seeking a single-prime, all-trades renovation of Rockford Fire Station #1, with specified building products, system upgrades, and optional alternates. - Government buyer: City of Rockford, Finance Department, Central Services Division, for the Rockford Fire Department; project at Fire Station #1 in Rockford, Illinois (Bid No. 1026-FD-099; Project No. 2023-018). - Construction scope: Renovate an occupied fire station, including selective demolition, exterior masonry repairs, site work, doors and windows, finishes, signage, furnishings, and architectural, structural, fire-protection, plumbing, HVAC, electrical, communications, and security work. The base bid includes replacement of the apparatus-bay trench drain with a formed concrete drain and Neenah 4990-CX grate. - Named manufacturers and vendors: Neenah (trench grate); Andersen (A-Series windows); Carrier (RTU-1); Mapes Canopies (canopy); Monarch Materials Group and St. Paul Corrugating (egress-well options); Springs Window Fashions (blinds); ICP Building Solutions Group (proposed flooring substitution); and Schlage, Von Duprin, LCN, Ives, and Zero (door hardware). Named project vendors include Mike Harris Mason Contractor (masonry repairs), Signs Now Rockford (signage), and Modernspace Studio - Rockford (FF&E). 3M tape is specified for signage mounting. - Products and quantities: 11 scheduled ADA/life-safety signs; one Carrier RTU-1, model 48FEEA04, under Alternate 8; Andersen A-Series composite windows; a Mapes Canopies aluminum canopy; fire extinguishers; Springs Window Fashions faux-wood blinds; door hardware and access-control components; card-access devices; and City-provided apparatus-bay light fixtures for contractor installation. Most quantities are not stated. - Alternates and notable requirements: Alternates include patio work, basement egress windows with either a cast-in-place concrete areaway or prefabricated below-grade assembly, a second-floor corridor window, hose-tower storage, apparatus-bay upgrades, workshop work, and the rooftop unit. Apparatus-bay work includes light-fixture coordination and installation and ceiling repainting; the Workshop 101 ceiling is also to be repainted. A $32,900 allowance is included for exterior masonry repairs by Mike Harris Mason Contractor. The City arranges asbestos abatement before construction, and the contractor must coordinate with that work. The project documents specify no substitutions for the FF&E; ICP Granitex High Build is identified only as a proposed substitution for specified Resuflor Deco Flake DB 1/4-inch flooring.

Description

The City of Rockford is soliciting bids for building alterations and renovation work at Rockford Fire Station #1, located at 528 Woodlawn Ave., Rockford, Illinois. The work includes base-bid construction and listed alternates, with project plans and specifications provided in the attachments. Addenda clarify and revise aspects of the bidding documents, including apparatus bay trench drain work, finishes, utilities, and other building systems. A mandatory pre-bid meeting is required, and bids are due December 7, 2026, at 11:00 a.m.

View original listing