Opportunity
Davenport Ionwave #27-30 Addendum 1
Davenport home rehabilitation and 24-by-24-foot garage construction
Posted
November 12, 2026
Respond By
December 10, 2026
Identifier
27-30 Addendum 1
NAICS
236118, 238190
The City of Davenport is seeking a general contractor to rehabilitate one federally funded home and build a detached garage in Davenport, Iowa. - Buyer: City of Davenport, including its Community Planning and Economic Development/Community & Economic Development functions and Purchasing Division; Urban Homestead program. - Project: Rehabilitate the single-family home at 2032 Dixwell Street for sale to a qualifying homeowner, and construct one 24-by-24-foot detached garage. - OEMs and brands: No OEMs or product brands are identified. The contractor proposes materials and finishes for City approval. Appliances are City-furnished; the contractor installs the range hood. - Major quantities: Replace 16 house windows and install 5 basement windows, 2 entry doors, 2 storm doors, one 96%-efficient-or-better gas furnace, one central A/C unit rated at least 15 SEER, one gas water heater, one active radon mitigation system, and one sump pump system. Build two replacement porches and one 24-by-24-foot garage. - Work scope: Lead hazard reduction, containment, cleaning and clearance; demolition; foundation, roof, siding, gutters, porches and sidewalks; electrical, plumbing and HVAC upgrades; insulation, drywall, interior layout and finishes; kitchen, two bathrooms and laundry improvements; and landscaping/soil controls. - Notable technical requirements: Lead work requires appropriately Iowa-certified contractors and workers, and the home must pass clearance testing before other trades proceed. Minimum insulation levels are R-13 for walls and R-49 for the attic. The electrical service must be 200 amps; the furnace must be at least 96% efficient; and the water heater must be at least 40 gallons with an efficiency rating of .60 or better. - Materials and restrictions: Standard-quality materials are required. Granite, hardwood flooring, composite decking and custom cabinets are not accepted. The City selects certain styles and finishes; stated allowances apply to specified fixtures and materials. - Compliance and contract requirements: HUD Section 3 compliance includes labor-hour tracking and reporting, with benchmarks of 25% of labor hours by Section 3 workers and 5% by Targeted Section 3 workers. The initial summary also identifies City and Iowa licensing/registration, federal funding and DBE outreach requirements, a 5% bid guarantee, bonding requirements for projects over $100,000, and 15% retainage until final occupancy permits. The RFP states prevailing-wage laws do not apply. - Period: Work is expected to start within three months of contract signing and finish within twelve months; no option years or annual subscription are specified. - Detailed line items: See the product and service lists below for listed quantities, item codes and scope details.
Description
The City of Davenport is requesting proposals from general contractors to rehabilitate one single-family home at 2032 Dixwell Street using federal funding; upon completion, the home will be sold to a qualifying homeowner. Proposals must include contractor qualifications, pricing, references, a project schedule, and a scope-of-work summary, and must be submitted through the City’s e-bidding system. Attendance at one of the two mandatory open-house site visits is required. The work includes lead-hazard reduction and home rehabilitation, with project requirements covering permits, licensing, insurance, and federal contractor provisions.