Opportunity
Massport #M454-C1 (General)
Fish Pier East two-floor lab and office fit-out with exterior elevator
Posted
November 10, 2026
Respond By
December 16, 2026
Identifier
M454-C1 (General)
NAICS
237990
The Massachusetts Port Authority is seeking construction bids to convert Fish Pier East tenant space into a two-floor laboratory and office, with an exterior elevator. - Buyer and project: Massachusetts Port Authority (Massport), Capital Programs Department; Contract M454-C1, New Blue Tech Space Fit-Out, at Fish Pier East, 212 Northern Avenue, Boston. - Construction scope: Renovation includes demolition, structural and envelope work, accessibility upgrades, an addition and elevator, and complete office, laboratory, support, and utility areas. Building-system work covers HVAC, plumbing, electrical, fire protection and alarm, and security/access control. DHK Architects prepared the drawings and specifications. - Filed sub-bid trades and estimated amounts: HVAC ($554,225); miscellaneous and ornamental iron ($105,579); lathing and plastering ($284,266); roofing and flashing ($53,498); glass and glazing ($334,028); tile ($27,746); masonry ($231,847); painting ($47,049); plumbing ($182,975); elevators ($195,000); electrical ($609,152); and fire-protection sprinklers ($99,260). These are trade estimates, not quantities. The overall engineer’s estimate is $5,746,814. - Named OEMs and product makers: Mitsubishi (VRF and heat-pump equipment), RenewAire (energy-recovery ventilator), Greenheck (exhaust fans), Marley (baseboard heaters), Modine (unit heaters), Powered Aire (air curtain), Rheem (water heater), Liberty (sump equipment), Watts, Taco, Leonard Valve Company, Amtrol, Elkay, TOTO, Fiat, Zurn, Honeywell, and Simplex (fire-alarm equipment). Elevator manufacturer is not specified. DHK Architects is the named design firm. - Notable specified equipment: Mitsubishi VRF system and associated indoor units and branch controllers; a 3,500-pound, 150-fpm passenger elevator; accessible toilet rooms; new sprinkler coverage; and deployable flood barriers. Product models and quantities are detailed below. - Important execution requirements: Coordinate work with continuing tenant and building operations, maintain land-side and water-side traffic, plan for winter conditions, and keep vibration at or below 0.5 in/sec. HVAC controls are standalone, with no required building-management-system integration; copper conductors are required; emergency lighting must have battery packs; and specified maximum whole-window U-factors are 0.32 for operable and 0.30 for fixed windows. A separate contract covers specified below-slab sanitary and vent piping, trenching, and slab restoration, with stub-ups for this contract’s plumbing work. - Duration: Construction is to be completed within 450 calendar days after the Construction Notice to Proceed. Stated milestones include submittals and material orders, substantial completion within 365 days, and final completion within 395 days. The Construction Notice to Proceed date is not specified.
Description
The Massachusetts Port Authority is seeking electronic general bids for the New Blue Tech Space Fit-Out at 212 Northern Ave, Boston. Work includes renovating tenant space within Fish Pier East into a two-floor lab/office space, including an exterior elevator. Bids must be submitted through Bid Express by December 16, 2026, and include a 5% bid deposit, a current DCAMM Certificate of Eligibility, and a completed Update Statement. The notice lists an estimated contract cost of $5,746,814.