Opportunity
SBIR / STTR #A224-015
Army SBIR Phase I research for UH-60 aircraft power-management architecture
Buyer
Army SBIR
Posted
May 26, 2022
Respond By
June 28, 2022
Identifier
A224-015
NAICS
541715, 541330
The U.S. Army SBIR seeks Phase I research to develop a power-management architecture for UH-60 aircraft, with potential application to future vertical lift and hybrid/electric aircraft. - Government buyer: U.S. Army Small Business Innovation Research (SBIR) program; no specific sub-agency or contracting office is identified. - Requested service: Develop and model a scalable UH-60 power-management architecture that can monitor and adjust electrical loads to meet mission needs, including rapid load shedding in emergencies. - Requirements and objectives: - Demonstrate advanced power-management modeling capability. - Design for scalability to future vertical lift (FVL) applications and hybrid/electric propulsion aircraft. - Follow Modular Open Systems Approach (MOSA) and Future Airborne Capability Environment (FACE) standards, with applicable government-purpose rights. - Support improved fuel and electrical efficiency, reduced weight and emissions, increased electrical power capability, and lower pilot workload through automation. - The broader topic describes later-phase hardware/software validation, integration testing, and limited UH-60 ground and flight demonstrations; these are not identified as Phase I deliverables. - Phase I funding is up to $250,000, with a performance period of up to six months. - No product quantities, part numbers, OEMs, or vendors are identified.
Description
Army SBIR seeks Phase I proposals to develop a power management architecture framework for the UH-60, supporting future fleet and hybrid/electric propulsion aircraft. The topic addresses advanced power management modeling and architectures intended to improve efficiency, reduce fuel use and emissions, and accommodate mission requirements, including rapid emergency load shedding. Proposers are expected to demonstrate modeling capability and develop an architecture framework that can serve as a basis for further electrical power system advancements. The topic lists an award amount of up to $250K and a duration of up to six months; proposals are submitted through the DSIP Portal.