Opportunity
Quebec SEAO #20185306
École La Source classroom renovation and reconfiguration
Posted
November 24, 2026
Respond By
December 10, 2026
Identifier
20185306
NAICS
236220
The Centre de services scolaire des Navigateurs is seeking bids for Phase 2 classroom renovations and adjoining-space integration at École La Source. - Government buyer: Centre de services scolaire des Navigateurs; project site: École La Source. - Requested work: Renovation and reconfiguration of classroom spaces, including demolition and construction of doors, frames, hardware, partitions, ceilings, and floor and wall finishes. - Building systems: Reconfigure supply and return systems; install lighting, power, electrical and network outlets; connect to the main electrical panel; and complete controls and fire-protection work. - OEMs and vendors: No OEMs, product vendors, or named contractors are identified. No specific products, models, part numbers, or quantities are listed. - Notable requirements: Plan work to minimize disruption to school occupants. Work after the substantial-completion target must take place outside occupied hours unless authorized in writing, with an advance-approved plan for work, deliveries, site access, safety, and continuity of school operations. The notice also requires French-language bids and 10% bid security. - Value and duration: Estimated value is 417,966, with currency unspecified. The notice lists a three-year estimated contract duration, excluding options; option periods are not specified.
Description
The Centre de services scolaire des Navigateurs is seeking bids for renovations to classroom spaces and integration of new adjoining spaces in an existing school. The work includes demolition and construction of doors, frames, partitions, floor and wall finishes, and ceilings, as well as reconfiguration of supply and return systems. Electrical work includes new lighting, power supply, electrical and network outlets, and connection to the main electrical panel; the scope also includes controls and fire-protection work. Work may begin June 28, 2027, with substantial completion targeted before August 13, 2027; work after that date must be scheduled outside occupied hours unless otherwise authorized.