Opportunity
San Diego County Ivalua #BPM012786 (RFP 12786)
East Mesa Juvenile Detention Facility Housing Unit Upgrades — CMAR Services and FF&E
Posted
October 13, 2026
Respond By
December 11, 2026
Identifier
BPM012786 (RFP 12786)
NAICS
236220, 337127
San Diego County is seeking a construction manager at risk for upgrades to four housing units at the East Mesa Juvenile Detention Facility. - Buyer: County of San Diego, Department of General Services, through the Department of Purchasing and Contracting. - Scope: CMAR preconstruction services and, if authorized after County acceptance of a Guaranteed Maximum Price (GMP), construction to upgrade four housing units. Work includes finishes, lighting, showers, toilets, furnishings, and related facility improvements; the contractor furnishes and installs furniture, fixtures, and equipment (FF&E). - Optional locks: Replace 50 key/pneumatic, 20 key/card-reader, and 20 key-only lock assemblies. Replacement assemblies must integrate with the existing Back Creek Security System. No lock manufacturer or part numbers are specified. - Named manufacturers and products: NORIX, CORETECH, Haskell, Haworth, Clairidge, HON, PEMCO, Samsung, and Chief are specified for furniture, shelving, television, or mounting hardware. The project’s design development drawings are by Davy Architecture. See product line items for quantities and part numbers. - Price and duration: Base contract not-to-exceed amount is $7.5 million; base scope plus Contract Option 1 is estimated not to exceed $8.3 million. Preconstruction is 45 calendar days, followed by up to 453 calendar days of construction if exercised; Option 1 construction runs concurrently. - Notable site requirements: Work is phased, with one housing unit available at a time and a two-week transition between units. Workers require Probation clearance, Red Badges, and in-person PREA training. Work takes place in an operating secure facility, requiring coordination for access, staging, noise, dust, and temporary shutdowns of security, fire-alarm, or other critical systems. At least 3% Small-Local Business subcontractor participation is required. Drawings require an in-person review and signed NDA.
Description
The County of San Diego is requesting proposals for Construction Manager at Risk services for the preconstruction and construction phases of East Mesa Juvenile Detention Facility (EMJDF) Upgrades, Part 2. The project includes a base scope and, at the County’s discretion, one or more contract options; each includes a preconstruction phase and may include a construction phase. During preconstruction, the contractor will collaborate with the County on existing conditions, design, constructability, cost, and schedule, and develop a Guaranteed Maximum Price for construction. The stated current estimated budget not to exceed for the project, including the base scope and Contract Option 1, is $8,300,000.