Opportunity

SAM #36C24627B0007

Central Virginia VA Healthcare System Sterile Processing Service Phase 3 Renovation

Buyer

Veterans Affairs National Cemetery Administration

Posted

November 25, 2026

Respond By

January 06, 2027

Identifier

36C24627B0007

NAICS

236220

The Department of Veterans Affairs is seeking a general construction contractor for Phase 3 of the Central Virginia VA Healthcare System’s Sterile Processing Service renovation in Richmond. - Government buyer: U.S. Department of Veterans Affairs, Veterans Health Administration; Central Virginia VA Health Care System, with Network Contracting Office 6 and the Office of Construction and Facilities Management identified in the materials. - Scope: Renovate the lower-level decontamination area of Building 500, including partitions, vestibule and sliding door, demolition and SPS-compliant seamless finishes, structural slab work, detergents-room fit-out, equipment installation or relocation, and supporting plumbing, HVAC, electrical, fire-protection, controls, and signage work. - Named OEMs and equipment: Getinge washer-disinfectors and cart washers; AMSCO Model 50 reprocessing sinks and V-PRO MAX 2 sterilization system; STERIS sterilizer loading car and transfer carriage; Innowave Unity Sonic Irrigator; and Johnson Controls existing building controls system. - Quantities identified: one Getinge 9100 Series cart washer, one Getinge 8668 four-bay washer/disinfector, one Getinge 9128 cart washer, two AMSCO Model 50 sinks, one ultrasonic cleaner, and one each of fixtures P-418, P-502, and P-708. Other equipment quantities are unspecified. - Important requirements: Maintain hospital and sterile-processing operations through phased work; protect infection-control barriers and clean/dirty separation; coordinate equipment utilities and installation; and complete commissioning, testing, validation, and operator training. New controls must use native BACnet and integrate with the existing Johnson Controls system. - Procurement and performance: 100% set aside for SDVOSBs. The base bid is one general-construction job, with an approximately 365-day period from Notice to Proceed. Estimated construction magnitude is $2 million to $5 million.

Description

Renovate SPS Phase 3-Construction

View original listing