Opportunity
PIEE #W912P627X1CZ7
Barrier IIB ATS and Emergency Generator Controls Modernization
Buyer
W072 ENDIST CHICAGO
Posted
November 24, 2026
Respond By
December 07, 2026
Identifier
W912P627X1CZ7
NAICS
238210
USACE’s Chicago District is seeking market input on modernizing the Barrier IIB automatic transfer and emergency generator paralleling controls at its electric dispersal barrier in Lockport/Romeoville, Illinois. - Government buyer: U.S. Army Corps of Engineers (USACE), Chicago District. - Opportunity: Sources-sought market research for a planned procurement, not a request for proposals or an award. Estimated project magnitude is $250,000–$500,000. - OEMs named as example control-platform providers: Rockwell Automation/Allen-Bradley, Schneider Electric, Woodward, DEIF, Siemens, and Schweitzer Engineering Laboratories (SEL). Equivalent open-architecture solutions may be proposed. - Requested equipment: - Modular PLCs or digital generator-paralleling controllers, with dedicated controls for the master switchgear, generator breakers, utility incoming breakers, and tie breaker. - Digital multifunction power transducers and Device 25 synchronizer/sync-check relays. - Industrial touchscreen HMI with a display of at least 15 inches. - Managed industrial Ethernet switches in a fault-tolerant ring configuration, plus protocol gateways as needed. - Turnkey services: Engineering, procurement, programming, fabrication, removal of legacy controls, installation, wiring, calibration, engine-startup assistance, testing, commissioning, and full-load validation. Deliverables include factory simulation and bench testing, updated CAD as-built drawings, technical documentation, and operator training. - Key operational requirements: Replace obsolete proprietary controls with a complete, non-proprietary, open-architecture COTS solution. Support automatic transfer and generator sequencing, synchronization, kW/kVAR load sharing, utility return, load management, metering, alarms, diagnostics, and standard industrial communications and programming platforms. - Cutover constraint: On-site cutover is estimated at no more than six consecutive calendar days. Emergency-generator readiness must be maintained, with at least one generator capable of automatic operation or rapid manual start.
Description
SOURCES SOUGHT NOTICE / MARKET SURVEY Project Title: Barrier IIB Automatic Transfer Switch (ATS) System Replacement************** Procurement Identification: PANGLR -26 -034692***********NAICS Code: 238210 Electrical Contractors and Other Wiring Installation Contractors (Small Business Size Standard: $19.0 Million)********PSC Code: Z2BG Repair or Alteration of Electronic and Communications Facilities********Estimated Project Magnitude / Cost: Between $250,000 and $500,000*********** Primary Performance Location: Chicago Sanitary and Ship Canal Electric Dispersal Barrier Facility (USGS / USACE Facility), 790 East Old Romeo Rd., Lockport/Romeoville, IL 60441**************By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the Barrier IIB Automatic Transfer Switch (ATS) System Replacement. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of an RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Notice will be solely at the responding party expense.*********t this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFQ. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this Notice.*GOVERNMENT REQUIREMENTS Under the proposed contract, the contractor will be required to provide turnkey engineering, procurement, programming, fabrication, removal, installation, testing, and commissioning services for the controls modernization of the Barrier IIB Automatic Transfer Switch (ATS) and Emergency Generator Paralleling Switchgear line-up (originally installed circa 2010).***Scope Summary:******The project requires the complete replacement and modernization of obsolete proprietary electronic control modules, network processors, transducers, and human-machine interface (HMI) touchscreens with modern, open-architecture, commercial-off-the-shelf (COTS) industrial control components.******The contractor shall provide a complete, non-proprietary functional solution meeting the following performance characteristics without relying on single-source, dealer-locked software or hardware:********1. Master, Utility, Tie, and Generator Control Processors:******Furnish and program modular, open-architecture Programmable Logic Controllers (PLCs) or purpose-built Digital Generator Paralleling Controllers with industrial Ethernet communications.*********** Provide dedicated processing hardware for:************* Master Switchgear Control (redundant processors AP1 and AP2)******** Generator Breaker Controls (dedicated controller per generator breaker)*******Utility Incoming Breaker Control (dedicated controller per utility breaker)***Tie Breaker Control (dedicated controller per tie breaker)****The control logic must automatically perform utility sensing, automatic transfer, generator start sequencing, dead-bus closing, auto-synchronization, isochronous kW and kVAR load sharing, soft-load open/closed-transition utility return, and load shed/add management.***Programming must utilize non-proprietary, standard industrial software (e.g., standard IEC 61131-3 logic platforms).********2. Power Sensing and Synchronization:****** Supply and install modern digital multi-function power transducers and automatic synchronizer / sync-check relays (Device 25) for each generator breaker, tie breaker, and utility source.**********3. Operator Interface (HMI) Visualization:*****Supply and install an industrial widescreen touchscreen display panel (minimum 15-inch diagonal) and dedicated processor running an industrial operating system.******The HMI software must display dynamic animated single-line electrical diagrams, breaker metering and status, alarm logging and management, mode selection (Auto/Manual/Test), and system diagnostics.*****Interface drivers must communicate natively via standard industrial protocols (Ethernet/IP, Modbus TCP, PROFINET, or OPC UA).********4. Network and Communications:***Furnish industrial managed Ethernet switches configured in a fault-tolerant ring communications architecture (replacing obsolete serial/proprietary network topologies).*****Provide protocol data gateways where necessary to output system data points (Modbus RTU/TCP or BACnet/Ethernet) to site supervisory networks.********5. Simulation and Pre-Testing:*****All PLC and HMI programming must be factory bench-tested and verified using a static simulator reproducing the site sequence of operations prior to mobilization.********6. On-Site Installation, Commissioning, and Constraints:******Perform on-site removal of legacy controllers, field wiring, mounting, terminations, calibrations, engine startup assistance, and full-load validation.********** Outage Limitation: On-site replacement and cutover must be accomplished within an aggressive coordinated window (estimated up to six (6) consecutive calendar days).*********Life-Safety Operational Continuity: The Chicago Dispersal Barrier operates 24/7. During modernization, the emergency power system must remain functional such that at least one (1) emergency generator is continuously capable of automatic operation or rapid manual start to back up the site load.*******Deliver updated CAD as-built production drawings, sequence of operations manuals, bill of materials, component data sheets, and comprehensive on-site operator training.****Estimated Period of Performance:****** Pre-engineering, hardware procurement, programming, and simulation testing: Ninety (90) to One Hundred Twenty (120) calendar days from Notice to Proceed (NTP).***********On-site physical installation, cutover, testing, and training: Up to six (6) consecutive calendar days.****REQUESTED INFORMATIONAL interested Small Businesses, certified HUBZone, 8(a), Women-Owned Small Businesses (WOSB), or Service-Disabled Veteran-Owned Small Businesses (SDVOSB) should respond to this market survey/sources sought via email no via email no later than December 7, 2026, at 2:00 p.m. Central Time.*******The following requests are designed to apprise the U.S. Army Corps of Engineers, Chicago District, of any prospective small business with industrial electrical switchgear, automatic transfer switch (ATS), and PLC control integration capabilities. This Agency requests that interested contractors submit the following:********7. Company Profile Small Business Status:**** Company name, physical address, website, and primary point of contact (name, title, telephone number, and email address.****Contractors Unique Entity Identifier (UEI) and CAGE Code.******** In consideration of North American Industry Classification System (NAICS) code 238210 with a small business size standard of $19.0 Million, which of the following small business categories is your business classified under, if any Small Business*Service-Disabled Veteran-Owned Small Business (SDVOSB)****** Small Disadvantaged Business (SDB)******* 8(a) Small Business*****Woman-Owned Small Business (WOSB)****Economically Disadvantaged Woman-Owned Small Business (EDWOSB)***HUBZone Small Business8.Technical Capability Solution Narrative:***A brief description of your firm capability to provide the required engineering, PLC/HMI programming, cabinet wiring, and on-site commissioning.*Identify the non-proprietary, open-architecture control platform(s) your firm is qualified to install and program (e.g., Rockwell Automation / Allen-Bradley, Schneider Electric, Woodward, DEIF, Siemens, Schweitzer Engineering Laboratories [SEL], or equal).**** Confirmation of capability to complete on-site cutover within an accelerated outage window (up to six consecutive calendar days) while maintaining continuous emergency backup power readiness.***********9. Descriptions of Experience (Past Performance):***** Interested firms must provide no more than three (3) example projects completed in the past five (5) years where the interested firm served as the prime contractor or specialized electrical/controls subcontractor on projects of similar size, scope, and complexity (e.g., industrial switchgear modernization, ATS replacement, generator paralleling controls, or SCADA/PLC retrofits).********* Each project must include the name, title, project role, email address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, and quality of performance.******** Based on the information above, for each project submitted, include:*******Current percentage of work complete and date when it was or will be completed.******* Scope and narrative of the project (specifically detailing PLC/controls and switchgear work).***The dollar value of the contract.***** The percentage of work that was self-performed by your firms own personnel.****Geographic location of the project.********10. Limitations on Subcontracting Compliance:*Small Businesses are reminded of the requirements of FAR 52.219-14 (Limitations on Subcontracting). For specialty trade / service contracts under NAICS 238210, the concern will perform at least 25% of the cost of the contract performance incurred for personnel with its own employees or employees of other similarly situated entities.**** Include a brief statement confirming how your firm will meet or exceed this self-performance requirement.********** The government will evaluate this information in shaping it*******s requirement and making a set aside determination. *********** SUBMISSION OF RESPONSES******* Page Limit: The total submittal package shall be no longer than five (5) pages. Please only include a narrative addressing the requested information; extraneous marketing collateral will not be reviewed.****** File Size Constraint: Electronic files sent via email CANNOT EXCEED 20MB (including email body and attachments); files exceeding this size will be rejected by the Government email server.*******Submission Deadline: Interested respondents shall provide their submittal package no later than December 7, 2026, at 2:00 p.m. Central Time.***Submit To: Stephanie Boyd********U.S. Army Corps of Engineers****** Chicago District Email: Stephanie.L.Boyd@usace.army.mil***********Ensure the Subject Line includes: Response to Sources Sought Notice: Barrier IIB ATS System Replacement PANGLR -26 -034692***********