Opportunity

Georgia Procurement Registry #PE-66952-NONST-2027-000000001

CNSNext Thomasville OLT 12 fiber-to-the-home construction

Posted

November 24, 2026

Respond By

December 22, 2026

Identifier

PE-66952-NONST-2027-000000001

NAICS

237130

CNSNext is seeking a contractor to build the outside-plant fiber network for its Thomasville OLT 12 service area. - Government buyer: South Georgia Governmental Services Authority (SGGSA), doing business as CNSNext. - Scope: Fiber-to-the-home construction, including directional boring and duct placement, buried and aerial fiber installation, handholes, pedestals, splice closures, distribution terminals, splitters, fusion splicing, testing, restoration, and closeout documentation. - Named OEMs and vendors: American Polymer (handholes; L141912UT0325HS, CH243624U2299HA); Channell (pedestal; OP12126C1B1LH1A08); Performed Line Products (pedestal and components; COYPED10-UOS-3-1, COYPED-BLKHD24P, 80821150); AFL (closures, splice tray, aerial hanger kit, and distribution-terminal components; AX-2-D-X-0-6-6-X, AX-TRAY-2-4, AX-KITAERIAL-1, AST-S-ASC-12, FC150793); CommScope (1x8 splitter and fiber cable; SP10800NNNNXABB, D-012-LA-8W-F12NS, D-024-LA-8WF-12NS); Maryland Specialty (superlash strand; #038X302X); and CT Comfit (1.25-inch couplers). Fiber cables 048ZUCT4F22D2010K and MA-0096F-SN-08T-F-BU are also specified, but no manufacturer is identified for them. No contractor or proposal vendor is named. - Estimated unit-price work quantities: 50 non-traffic handholes; 1 traffic-rated handhole; 90 pedestals; 22,920 linear feet of conduit-installed fiber across 12-, 24-, 48-, and 288-count cables; 20,392 linear feet of directional boring; 2 buried and 76 aerial splice closures; 72 buried and 653 aerial 12-port distribution terminals; 736 1x8 splitters; 5,265 single-fusion splices; and 298,616 linear feet of aerial fiber across 12-, 24-, 48-, 96-, and 288-count cables. Restoration, traffic control, and hydrovac are also included as authorized work items. Quantities are estimates, not guaranteed orders. - Notable requirements: Fiber testing must include OTDR and power-meter testing, with results, splice records, and as-built drawings submitted. Required permits and pole-owner approvals must be confirmed before work begins on a segment. The work includes utility locating, traffic control, surface restoration, cleanup, and coordination with pole owners. A two-year warranty applies; late final completion is subject to $500 per calendar day in liquidated damages. SGGSA furnishes certain project materials. - Performance and qualifications: Begin within 20 days after notice to proceed, reach substantial completion within 90 calendar days, and final completion within 150 calendar days. Proposers must demonstrate at least three comparable completed fiber outside-plant projects and meet Georgia and local licensing and E-Verify requirements. A bid bond or permitted security of at least 5% and performance and payment bonds each equal to 100% of the contract amount are required.

Description

The South Georgia Governmental Services Authority (SGGSA), d/b/a CNSNext, seeks competitive sealed proposals from qualified contractors to construct fiber-to-the-home outside plant in the Thomasville service area (OLT 12). Work includes directional boring and duct placement, buried and aerial fiber installation, handholes and pedestals, splice closures and terminals, splitters, splicing, testing, documentation, restoration, and coordination with pole owners. The work will be performed under a unit-price construction agreement, with payment for units actually installed and accepted; estimated quantities are not guaranteed. No federal funds are involved.

View original listing