Opportunity
Minneapolis Supplier Systems #0000004310
Minneapolis Bossen Field water main rehabilitation with carbon-fiber lining
Posted
November 24, 2026
Respond By
December 17, 2026
Identifier
0000004310
NAICS
237110
The City of Minneapolis is seeking bids to rehabilitate the water main at Bossen Field using carbon-fiber lining. - Government buyer: City of Minneapolis, Public Works — Water Treatment and Distribution Services; procurement office: Finance and Property Services — Procurement. - Scope: Rehabilitate approximately 2,000 feet of 48-inch welded steel water main along East 56th Street, including cleaning, surface preparation, cement-mortar lining repairs as needed, CFRP liner installation, testing, and site restoration. - Bid-form work quantities: Interior pipe surface preparation — 2,000 LF; CFRP installation — 2,000 LF; environmental controls — 1 each; pipe spot repairs — 4,000 SF. - Technical requirements: The liner must be suitable for potable water and certified to NSF/ANSI 61. The system must meet AWWA C305 requirements as a stand-alone system, use components from one manufacturer, and be designed for a 50-year service life. A five-year lining warranty is required. - OEMs and vendors: No liner manufacturer, OEM, or vendor is identified. Mallory Cina is named as the City contact, not as a vendor. - Schedule: Substantial and final completion milestones are specified in the solicitation, but the overall project duration is not stated.
Description
The City of Minneapolis is seeking bids for materials, labor, equipment, and incidentals necessary to perform Bossen Field Carbon Fiber Lining for Public Works—Water Treatment and Distribution. Bid-form line items include interior pipe surface preparation, carbon fiber reinforced polymer installation, environmental controls, and spot repairs of pipe. A mandatory virtual pre-bid meeting is scheduled, and bids must be submitted electronically; bids from firms that did not attend the meeting will be marked non-responsive. The solicitation requires a 5% bid deposit and payment and performance bonds equal to 100% of the contract amount.