Opportunity
Indio Planet bids #IT-FIBER25
Indio FFA Last Mile Phase 2 Underground Fiber Construction
Posted
November 23, 2026
Respond By
December 10, 2026
Identifier
IT-FIBER25
NAICS
237130
The City of Indio is seeking a contractor to extend its broadband network through the FFA Last Mile Project, Phase 2. - Buyer: City of Indio, Public Works Department / Public Works Engineering, Riverside County, California. - Scope: Install approximately 20,829 linear feet of underground fiber-optic cable and two 2-inch conduits, with route-specific laterals, vaults, enclosures, and related network elements. Work spans six listed lateral groupings and includes directional boring, microtrenching, open-cut trenching, cable splicing, testing, and surface restoration. - Products and materials: 1-inch and 2-inch HDPE conduit; single-mode, 96-count non-armored ribbon-tube fiber cable and slack; 12-inch flowerpot drop vaults and 24 x 36-inch medium vaults; FOSC 450 B splice closures; SM12 splice trays; B-gel closure slack baskets; #12 AWG solid THHN tracer wire; mule tape; and 5/8-inch x 8-foot copper-clad ground rods. Quantities for many bid-schedule items are estimated or itemized by route; no part numbers are provided. The specifications also identify Camo Mastic or approved equal for microtrench pavement restoration. - Named OEMs/vendors and products: No cable or equipment manufacturer is identified. Camo Mastic is named as an approved pavement-restoration material; Underground Service Alert is named for utility notification. - Notable requirements: Contractors must demonstrate fiber outside-plant experience and provide certified splicing technicians, OTDR and power-meter testing, and testing of all installed strands, including spare and unassigned fibers. Closeout includes test results, raw OTDR traces, bore logs, redlines, georeferenced photos, and production reports. The prime must hold a Class A license; a C-7 low-voltage subcontractor is permitted. Microtrenching must have uniform, neat edges and pavement restored level with the adjacent roadway; an 18-inch-wide T-cut may be required when specified fill conditions cannot be met. - Schedule and value: Estimated value is approximately $4.75 million. The overview states completion within 60 working days, while technical provisions state 180 working days from the second Notice to Proceed; the documents conflict. A one-year warranty and a 180-day network performance period before final acceptance are also specified.
Description
The City of Indio is seeking bids for Phase 2 of the FFA Last Mile Project. Work includes installing 1-inch and 2-inch HDPE conduit, vaults, directional boring, micro-trenching, open trenching, asphalt and concrete removal and replacement, underground fiber cable, splicing, and associated labor and materials. The contractor must have fiber optic installation experience; competency review includes outside-plant construction experience, similar completed projects, certified splicing technicians, and OTDR and power-meter testing capability. The estimated value is $4,750,000, and the work must be completed within 60 working days.