Opportunity

Saskatchewan Tenders #HSD2026-9

Raymore School roof replacement, including new roofing assemblies and rooftop fall protection

Posted

November 24, 2026

Respond By

December 17, 2026

Identifier

HSD2026-9

NAICS

238160

Horizon School Division No. 205 is seeking a contractor to replace the roof at Raymore School in Saskatchewan. - Government buyer: Horizon School Division No. 205 (also identified as Horizon School Division/HSD); project site: Raymore School. Howes Roof Consultants Inc. is named as the consultant handling inquiries and bid submissions. - Scope: Remove and dispose of existing ballast, EPDM roofing, guards, perimeter flashings, and wet insulation on Roofs 6 and 7; remove an unused satellite dish from Roof 8. Replace approximately 45,000 square feet across nine roof sections, with actual measurements to be confirmed on site. - Roofing: Install roof-specific insulation assemblies and SBS modified-bituminous cap-sheet roofing, metal fascia and flashings, vapor-barrier extensions, and related roofing components. Retain specified existing gutters, leaf screens, goosenecks, and ventilators for reinstallation. - Named manufacturers and products: Soprema (including Soprasmart/Soprasmart ISO HD 180, Sopra-Iso Plus, and Sopramastic), IKO (IKO-Therm III and Shieldbase 180), Skyline Group (5001 RoofBarrier and RoofLine), Durablok (DBE Series equipment supports), and Thaler (SJ-27 pre-insulated flashing). Soprema and IKO are identified as accepted roofing manufacturers. - Fall protection and equipment: Provide non-penetrating modular rooftop guardrails and control-zone demarcation, plus non-penetrating supports for rooftop conduits, cables, and gas pipes. The RoofLine control zone is to be at least 2,000 mm from the roof edge. - Allowances and warranties: Specifications include two $50,000 breakout allowances—one for guardrails/control-zone demarcation and one for approximately 2,700 linear feet of vapor-barrier extensions. Roofs 6 and 7 require a 15-year manufacturer total-system warranty; other specified roof areas require manufacturer system warranties, and the installer must provide a two-year CRCA warranty. - Contractor qualifications: Mandatory site review attendance, good-standing membership in the Saskatchewan Roofing Contractors Association and/or Canadian Roofing Contractors Association, and certification as an applicator by the roofing material manufacturers are required. Partial or incomplete bids are not accepted. - Performance: Work is expected to start when weather conditions are suitable and be completed by August 2027; no fixed start date or total duration is stated.

Description

The work involves removing approximately 45,000 ft² of existing roofing across nine roof sections and installing new roofing components and an SBS modified-bituminous membrane. The work is expected to begin when weather conditions are suitable and must be completed on or before August 28, 2027. Bids must be stipulated-sum bids; partial or incomplete bids will not be accepted, and limited unit-price work is included. Attendance at the November 27, 2026 site review is mandatory, and bidders must meet the stated roofing association membership and manufacturer certification requirements.

View original listing