Opportunity

Utah Public Procurement Place U3P #WJPS27112301

Jordan River Big Bend habitat restoration, irrigation, and pump-station construction

Posted

November 23, 2026

Respond By

December 29, 2026

Identifier

WJPS27112301

NAICS

237990, 237110

The City of West Jordan is seeking a contractor for a multi-part Jordan River habitat restoration and site-construction project. - Government buyer: City of West Jordan, Public Works Department, West Jordan, Utah. - Scope: Restore the Big Bend reach of the Jordan River through channel and floodplain grading, water management, boulder features, drainage, trails, fencing, revegetation, irrigation, and pump-station construction. - Products and quantities: Includes 1,812 tons of boulder, 200 LF of 15-inch HDPE drainage pipe, 760 LF of 6-inch DR-25 C900 PVC pipe, two duty pumps (one base bid and one alternate), one jockey pump, seed and planting materials, irrigation equipment, and trail and site materials. See line items for quantities and add-alternate details. - Alternates: Four add-alternates cover additional planting and spray-irrigation areas, an overlook trail and related materials, flow/pressure-control valves, stockpile haul-off, and added pump/electrical work. - Notable requirements: River and fish-screen protection, care of water, erosion-control measures, and coordination around existing trees, utilities, and monitoring infrastructure. The solicitation requires a Utah E-100 General Contractor license. - OEMs and vendors: No manufacturers, branded products, or bidding vendors are named.

Description

The City of West Jordan is seeking bids for construction of the Big Bend Habitat Restoration Project 2026 Phase along the Jordan River. Work includes grading the floodplain, meandering channel, landscape and pond trails; stockpiling; fence removal and installation; seeding and planting; and installation of irrigation, pump system and pumphouse. The work also includes care of water and associated appurtenant work in accordance with the drawings and specifications. Substantial completion is required by November 30, 2027, and no work may occur after December 31, 2027.

View original listing