Opportunity

CanadaBuys #RF-97-208

Flood-response equipment and contractor services for Manitoba dikes

Posted

November 23, 2026

Respond By

December 16, 2026

Identifier

RF-97-208

NAICS

237990

Manitoba is seeking contractors and heavy equipment for flood-response work at Assiniboine River and Portage Diversion dikes. - Government buyer: Manitoba Transportation and Infrastructure, Tendering and Contracts. - Scope: Build and remove clay closures at dike openings; handle borrow material; repair and maintain dikes; clean up and remediate sites; manage traffic; and open the Portage Diversion Failsafe if required. - Equipment and labor requested (hourly bid quantities): - Group 14 hydraulic excavator (8); Group 12 hydraulic excavator (8); Group 9 hydraulic excavator with twist bucket (three entries of 8 each). - Group 6 and Group 5 crawler tractors with 6-way dozer and low ground pressure (LGP), 8 each; Group 6 tracked skid-steer loader with bucket and forks (2). - Tandem-axle end-dump straight truck with minimum 7 cu. m box (32); tandem-axle end-dump semi-trailer (64); 3/4- or 1-ton crew-cab 4x4 truck with trailer (2). - Traffic control flag persons (2) and labourers (10). - OEMs and vendors: No manufacturers, OEMs, or vendors are named. Equipment specifications are provided by class and configuration, not brand or part number. - Notable requirements: Work is dependent on flood events, and listed quantities are not guaranteed. Equipment will not be mobilized or paid for if dike closures are unnecessary. The contract establishes a binding unit-price arrangement with the low bidder for spring response and a non-binding call-out list for possible summer or fall work.

Description

The tender seeks flood-response activities for a spring flood event and establishes a non-binding call-out list for possible future summer and/or fall events. Work includes constructing and removing clay closures at openings in the Assiniboine River and Portage Diversion flood-protection dikes, and opening the Portage Diversion Failsafe if required. The contractor must provide equipment and perform activities including borrow-material handling, dike repair and maintenance, site cleanup and remediation, and traffic management. Work quantities and timing are uncertain, are not guaranteed, and no mobilization or payment will occur if closures are not required.

View original listing