Opportunity
Pembroke Pines Opengov #PSPW-26-QQ-10
Club 19 Insulated Aluminum Awning Replacement
Posted
November 10, 2026
Respond By
November 23, 2026
Identifier
PSPW-26-QQ-10
NAICS
238190
The City of Pembroke Pines is seeking a contractor to replace the Club 19 outdoor bar awning with a complete insulated aluminum roof system. - Government buyer: City of Pembroke Pines, Procurement Department, with the project managed through Public Services. - Requested system: One complete awning installation covering approximately 1,318 square feet, including a 4-inch insulated aluminum-panel roof (0.024 x 2-lb EPS; Florida Product Approval FL-7561), approximately ten 6 x 6 x 1/8-inch aluminum columns, 4 x 10 x 1/8-inch aluminum beams, accessories, anchoring, and one isolated concrete footing. FL-7561 is an approval reference, not a manufacturer or part number. - Construction services: Remove and dispose of the existing awning, install the new system, and complete related protection, permits, inspections, restoration, cleanup, and closeout. Construction and demolition debris must be handled by Waste Pro of Florida, Inc., the City's designated provider. - Named firms: Design consultants are Stephen Griss Associates (architecture), Calc Engineering (structural engineering), and Whitlocke & Williams (MEP engineering). No awning-system OEM or manufacturer is identified. - Notable requirements: Contractors must have at least five years of relevant experience and provide three similar-project references, hold applicable Florida contractor licenses, and provide Florida-licensed Professional Engineer design and sealing where required for temporary works. Documents include HUD Section 3 and prevailing-wage/certified-payroll requirements while also stating federal or grant funding is not applicable; bidders should confirm which requirements apply. - Estimated project value: $56,000. Complete the work within 10 calendar days after the Notice to Proceed.
Description
The City of Pembroke Pines seeks bids to furnish and install a new covered awning at Club 19. Work includes demolition and disposal of existing materials and installation of an approximately 1,318-square-foot aluminum awning with a 4-inch insulated roof system, structural aluminum columns and beams, roofing accessories, and associated footing and anchoring. The contractor must coordinate submittals, permits, inspections, safety, restoration, cleanup, and closeout, and complete the work within 10 calendar days of the City’s Notice to Proceed. Electronic bids are due through the OpenGov portal; the estimated project cost is $56,000.