Opportunity

City of Sebastian MyVendorLink #B-27-06-COC

Replace and repair approximately 60 linear feet of seawall at City of Cocoa Lift Station No. 1

Posted

November 23, 2026

Respond By

January 06, 2027

Identifier

B-27-06-COC

NAICS

237990, 238190

The City of Cocoa is seeking a contractor to replace and repair approximately 60 linear feet of seawall at Lift Station No. 1 in Cocoa, Florida. - Government buyer: City of Cocoa, Florida; Lift Station No. 1, 210 Riverside Drive, Cocoa, Brevard County. - Work requested: Demolish and remove the deteriorated seawall and install a replacement with associated structural components. - Materials: Approximately 60 linear feet of marine sheet piling; design may specify vinyl, composite, reinforced concrete, or steel. Include tiebacks, deadmen, wales, and a poured-in-place concrete or composite cap. - Related work: Maintain or modify the existing stormwater outfall pipe; perform excavation, grading, backfill, compaction, and site restoration; protect utilities and lift station infrastructure. - Notable requirements: Implement erosion and sediment controls to protect the Indian River Lagoon, including turbidity barriers, silt fencing, or floating silt curtains. Inspect controls regularly and after heavy rain, and remove them after the site is stabilized. - OEMs and vendors: No manufacturers, OEMs, or vendors are named; material selection is subject to the engineering design.

Description

The City of Cocoa is seeking a contractor to provide labor, materials, equipment, supervision, and incidentals for its Lift Station No. 1 Seawall Replacement-Repair Project. Work includes demolishing and replacing or repairing approximately 60 linear feet of seawall and maintaining or modifying an existing stormwater outfall pipe discharging into the lagoon. The scope includes permitting, erosion controls, excavation, sheet-pile installation with tiebacks and a seawall cap, and site restoration. Work must follow project plans and specifications, applicable codes, and required permits; the contractor must examine the site before bidding and provide a work schedule after award.

View original listing