Opportunity

SAM #FA2396-27-9CTBD

AFRL Bombers Directorate Hallway Design and Facility Enhancement

Buyer

AFRL Headquarters

Posted

November 23, 2026

Respond By

December 05, 2026

Identifier

FA2396-27-9CTBD

NAICS

236220

AFRL seeks a firm-fixed-price redesign and enhancement of the Bombers Directorate hallway at Wright-Patterson AFB. - Government buyer: Department of the Air Force, Air Force Research Laboratory (AFRL), project office AFRL/RMZ. The initial notice also identifies AFRL HQ AFRL/PK and the RISE program; Megan Rosenbeck is named as a contact. - Scope: Design, engineer, source, fabricate, and install bomber-themed hallway features in Building 556, including environmental graphics, heraldry shields, UV-resistant suspended aircraft scale models, historical elements, painting, architectural finishes, decals, and visual enhancements. - Aircraft represented: B-52, B-1, B-2, and B-21. Four outward-facing display cases recessed into the wall are specified. - OEMs and vendors: No product OEMs, manufacturers, or contractor vendors are identified by name. Aircraft models are identified, but their manufacturers are not specified. - Key requirements: Complete the project within 90 calendar days. Milestones include kickoff within 10 days, a site-specific Heritage Hall plan within 30 days, sourcing and staging verification within 60 days, and installation and closeout within 90 days. On-site installation is limited to 30 days. - Site and security requirements: Preserve restroom access; no interruption may exceed 30 consecutive minutes. U.S. citizenship, facility security procedures, domestic-content requirements, and CMMC Level 1 apply. Work begins only after written Notice to Proceed.

Description

This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria.

To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio. This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures.

Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.

View original listing