Opportunity

New York State Contract Reporter #2140375

SUNY ESF Newcomb Campus storm-damage infrastructure restoration

Posted

November 23, 2026

Respond By

January 06, 2027

Identifier

2140375

NAICS

237310, 237990

SUNY ESF is seeking a general construction contractor to restore storm-damaged infrastructure at its Newcomb Campus. - Government buyer: State University of New York (SUNY), through the College of Environmental Science and Forestry (SUNY ESF), Facilities Planning, Design and Construction. Elizabeth Parsons is identified as a contact; the work is at the SUNY ESF Newcomb Campus in Essex County, New York. - Scope: Reconstruct or replace five boardwalks and four bridges near Rich Lake and the Adirondack Interpretive Center; replace roadway culverts; repair headwalls and drainage swales; grade and resurface roads; realign a guide rail; stabilize areas with riprap; and restore disturbed sites. - Specified materials and quantities: HDPE storm culverts, in 18-inch and 24-inch diameters, with listed lengths from 20 to 40 linear feet at specified Catlin Lake Road locations; two stone headwalls at Wolf Lake Road, plus additional headwalls where shown; five boardwalks; four bridges; and temporary timber construction mats. See line items for locations and details. - Notable construction requirements: Bridge and boardwalk work includes treated timber, cribbing, handrails at specified structures, ramps and viewing platforms. Temporary cofferdams, turbidity controls, erosion and sediment controls, dewatering, and wetland/stream access measures are required where applicable. Maintain campus building access and restore disturbed areas. - Environmental and project conditions: Follow applicable NYSDEC and U.S. Army Corps of Engineers permit conditions and coordinate with the Adirondack Park Agency. Tree clearing and in-stream work are subject to seasonal restrictions; in-stream work outside the permitted window requires project-specific authorization. The project manual also sets a 90% construction-and-demolition waste diversion goal. - Schedule and other terms: Substantial completion is required within 180 calendar days after Notice to Proceed. A $160,000 field-order allowance is included. No OEMs, manufacturers, or commercial vendors are identified. No specific product part numbers are provided.

Description

SUNY ESF is seeking proposals to restore storm-damaged infrastructure throughout the SUNY ESF Newcomb Campus. Work includes reconstructing bridges and boardwalks near Rich Lake and the Adirondack Interpretive Center, with timber crib foundations, framing, decking, handrails, ramps, and trail transitions. Roadway and drainage work includes culvert replacement and installation, stone headwalls, grading and resurfacing, drainage swale improvements, riprap stabilization, and associated site restoration. The contract term is 180 days.

View original listing