Opportunity
Texas DIR/ESBD #RFB2026-071
Texas Central Parkway drainage, channel, and roadway improvements
Posted
November 23, 2026
Respond By
January 12, 2027
Identifier
RFB2026-071
NAICS
237310, 237990
The City of Waco is seeking a civil construction contractor for drainage and roadway improvements along Texas Central Parkway and North Flat Creek. - Government buyer: City of Waco, Purchasing Services; purchasing agent Melanie Wade. Project 75DR2504; RFB 2026-071. - Scope: Abandon existing channel and pipe structures; build a concrete-lined channel, culvert and drainage structures; repair and pave roadway; and perform channel, vegetation, traffic-control, and stormwater work. - OEMs and vendors: No construction OEMs or product vendors are specified. EUNA/Bonfire is named as the City’s electronic bidding platform, not a construction provider. - Major quantities: 5,175 SF concrete-lined channel; 252 LF of 6 ft x 4 ft concrete box culvert; 240 LF of 21-inch Class III reinforced concrete pipe; 1,340 SF concrete riprap; 1,720 SY HMA base course; and 4,470 SY each of imported topsoil and Bermuda sod. See line items for the complete schedule and references. - Notable requirements: Complete within 60 calendar days after Notice to Proceed; general contractor must self-perform at least 30% of the project; bid security is 5% of the bid; liquidated damages are $1,000 per day of delay. Pricing-form caps apply to mobilization (10%) and bonds and insurance (2.5%). TxDOT qualifications are not required; intended award is to the lowest responsible bidder. - Estimated value: No official estimate is provided; the range below is an indicative planning estimate.
Description
The City of Waco is seeking bids for drainage improvements in Texas Central Parkway. Work includes concrete channel abandonment and installation of concrete channel, flume, riprap, reinforced concrete box structures, headwalls, wingwalls, and associated pipe and inlet work. Supporting work includes paving repairs, curb and gutter installation, and vegetation and debris removal in North Flat Creek. The project is to be completed within 60 calendar days from the Notice to Proceed, and the general contractor must self-perform 30% of the project.