Opportunity
Iowa City Community School District Bidopportunities #26-19
Sac County nutrient-reduction wetland construction with solar-powered pumping system
Posted
November 22, 2026
Respond By
December 30, 2026
Identifier
26-19
NAICS
237990, 237110
Iowa is seeking a contractor to build the Sac883604B nutrient-reduction wetland and solar-powered pumping system in Sac County. - Government buyer: Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality, Water Resources Bureau. - Project: Sac883604B Nutrient Reduction Wetland Project, Bid No. 26-19, in Sac County, Iowa. The wetland is designed to intercept and treat drainage-tile water for nutrient reduction. - Named manufacturers and suppliers: Carry Pumps / Carry Manufacturing, Energy Service Solutions LLC, Agri-Drain, and Sun Rac. The specifications allow approved equivalents for certain components. - Key equipment and quantities: One lift-station/pump/electrical/solar assembly; one 60-inch lift-station structure; one 48-inch Modified SW401 outlet structure; one two-chamber water-control assembly; 36 minimum 400-watt solar modules; and one controller, combiner, inline fuse, pump, and level transducer. The solar mounting schedule lists four Sun Rac kits under each of two part numbers. - Pipe and materials: 45 LF of 18-inch reinforced-concrete pipe, 35 LF of 21-inch reinforced-concrete pipe, 579 LF of 24-inch HDPE dual-wall pipe, 67 LF of 15-inch HDPE dual-wall pipe, two pipe aprons, one CMP water-control structure, 40 LF of 12-inch CMP culvert, 37 tons of Class E riprap, 30 tons of Class A roadstone, and 140 CY of trench-stabilization material. - Construction services and estimated quantities: About 7,800 CY of total earthwork, including 1,911 CY excavation and 1,902 CY earthfill; 3,971 CY of topsoil placement; tile investigation, removal and burial, and three large-tile connections; site preparation; 738 LF of straw wattle; and about 4.9 acres of seeding (4.2 acres buffer and 0.7 acres structure/channel). - Notable technical requirements: The pump basis of design is a Carry Pumps CP06-series, 7.5 HP unit, specified to deliver 600 GPM at 17 feet total dynamic head. The solar system basis of design is Energy Service Solutions LLC’s DPC7500-75C kit, with a minimum 10 HP solar VFD and 36 minimum 400-watt PV modules. Wetland and site work must follow applicable Iowa and NRCS specifications; cultural-resource discoveries require work to stop and the local NRCS office to be notified. The operation and maintenance plan requires maintenance for the life of the practice, at least 15 years. - Estimated construction value: $175,000–$275,000.
Description
The project involves constructing a nutrient reduction wetland in Sac County, Iowa, to treat water from an existing ditch using a solar-powered pump. Work includes clearing, excavation and grading, tile and outlet structures, a lift station and pump assembly with solar panels, pipe and riprap installation, and seeding. Quantities include approximately 7,800 cubic yards of earthwork, 726 linear feet of pipe, and 4.9 acres of seeding. Construction is to be completed by November 1, 2027, and seeding by December 15, 2027; the estimated construction cost is $175,000–$275,000.