Opportunity
Union County Public Schools #7-34800004
Piedmont High School Resinous Flooring Installation
Posted
November 21, 2026
Identifier
7-34800004
NAICS
238330
Union County Public Schools is seeking a contractor to install a resinous floor system at Piedmont High School in Monroe, North Carolina. - Buyer: Union County Public Schools, Facilities; Procurement Lead Jacob Phipps. - Scope: Price an epoxy flooring system as the primary proposal and a polyaspartic system as an alternate. UCPS will select one system, not both. - OEM and basis of design: Stonhard Inc.; the specified Stontec flooring is the basis-of-design product, and comparable products may be proposed. - Flooring requirements: 1/8-inch, seamless, textured resinous flooring with a 5-inch integral cove base and zinc cove strip. The epoxy design calls for body coats, vinyl flakes, and clear epoxy topcoats with an orange-peel finish. The system must resist abrasion, impact, and chemicals. - Installation: Provide labor, materials, equipment, substrate preparation, and application, including priming, broadcast coats with chips, grout coat, topcoat, and cove base. Existing VCT has been removed and the concrete polished. - Qualification and submittals: The installer must be manufacturer-trained, approved, and certified. Bidders must provide material certificates and qualified-agency test reports; maintenance data is required at closeout. - Scheduling: Pricing is requested for a preferred December installation window and an alternate March–April window. Bidders must state the consecutive calendar days needed for completion after Notice to Proceed. - No floor area, product quantities, or product part numbers are specified.
Description
Union County Public Schools is soliciting bids for flooring work at Piedmont High School. Bidders must price an epoxy flooring system as the primary proposal and a polyaspartic flooring system as an alternate; UCPS will award one system, not both. Pricing is requested for a preferred December 19–31, 2026 installation period and an alternate March 26–April 2, 2027 period. A mandatory prebid meeting and site visit are required; the scope includes a resin-based, aggregate-filled seamless floor system with integral cove base.