Opportunity

El Paso Water Ionwave #44-26

Northwest El Paso water and wastewater infrastructure construction

Posted

November 20, 2026

Respond By

December 09, 2026

Identifier

44-26

NAICS

237110

El Paso Water is seeking bids for major water and wastewater infrastructure construction in northwest El Paso County. - Government buyer: El Paso Water Utilities Public Service Board, under El Paso Water Utilities (EP Water), serving the Ponderosa, Schuman Estates, Brothers Road, and Western Village areas. - Scope: Install water mains and sanitary sewer lines, service laterals, manholes, casings, and liners; decommission septic and cesspool systems; and restore pavement and other disturbed improvements. An additive alternate covers sewer improvements at 300 Canutillo La Union Avenue. - Major quantities: 2,450 of 8-inch C-900 DR14 water main; 40,479 of 8- and 12-inch sanitary sewer pipe across the listed depth ranges; 26 manholes; 665 of steel casing; 312 of cure-in-place fiberglass liner; and 368 sewer service laterals. Quantities are reproduced from the bid items; units are not specified here. - Other work: Water valves, hydrants, water services, septic-system backfilling and decommissioning, trench safety, dewatering, traffic control, removal and replacement of pavement and other improvements, and pre- and post-construction video documentation. - Notable technical requirements: Geotechnical recommendations include Class I gravel pipe bedding, excavation support as needed, groundwater and dewatering monitoring, and attention to trench stability and nearby structures. The project anticipates open-trench installation generally 5–10 feet below existing grade, based on the geotechnical study; bid items also include deeper sewer installations. - Named organizations: CEA Group and WSP are identified in the geotechnical materials. Neither is identified as an OEM or product supplier. No product manufacturers or OEMs are named. - Estimated value: $23,413,837.50–$26,665,759.38. - Performance: Substantial completion is required within 420 calendar days after contract time begins; final completion is required within 450 calendar days.

Description

EP Water is seeking bids for the Northwest Area First Time Water & Wastewater Area #2 project in areas west of Doniphan Drive. The procurement is identified as a low-bid solicitation, with front-end specifications, drawings, and a geotechnical report listed among the bid documents. The original bid bond is due before the bid opening, and plans are available to registered suppliers after login. The engineer's estimate is $23,413,837.50–$26,665,759.38.

View original listing