Opportunity
Wichita Bonfire #260298
Levee J Toe Drain Installation for Wichita Valley Center Flood Control Project
Posted
November 20, 2026
Respond By
December 11, 2026
Identifier
260298
NAICS
237990
The City of Wichita is seeking a construction contractor for Levee J toe-drain installation in the Wichita Valley Center Flood Control Project. - Government buyer: City of Wichita, Public Works & Utilities Department; the attachment identifies the City Purchasing Manager’s office. Project location is west of Meridian and north of 53rd Street North, Wichita, Kansas. - Scope: Install and restore the toe-drain system, including excavation, pipe and risers, manholes, backfill, traffic control, and erosion controls. - Products and quantities: 6,363 linear feet of 6-inch perforated HDPE pipe with filter sock; 420 linear feet of 6-inch non-perforated HDPE risers; 42 riser caps and outlet appurtenances; 33 48-inch precast concrete manholes; 18 units of 6-inch CMP pipe; 5,920 cubic yards of filter media meeting ASTM C33; one rope gate; and 8,484 square yards of SC150 or equivalent erosion-control blanket. No part numbers are provided. - Construction services and quantities: Site clearing, site restoration, and traffic control (one lump-sum item each); 659 cubic yards of topsoil excavation and stockpiling; 7,424 cubic yards of trench excavation; 10,994 cubic yards of earthfill; 1,485 linear feet of silt barrier; 16 ditch-check protection units; and six stabilized entrances. The overall service is Levee J Toe Drain Installation. - OEMs and named vendors: No product OEMs or bidding vendors are identified. ARC / ARC Document Solutions is mentioned only as a source for specifications and the electronic plan room. - Notable requirements: Work is to be completed by the project deadline stated in the solicitation. A 5% bid bond is required; the successful contractor must provide performance and labor-and-material payment bonds covering at least the full contract amount. No pre-bid conference is specified. The project is not state- or federally funded.
Description
The City of Wichita is seeking bids for construction services for the Public Works & Utilities Department. The work is the installation of the Levee J toe drain for the Wichita Valley Center Flood Control Project, including site work and toe drain pipe, riser, manhole, filter media, and erosion-control bid items. All work must be completed by August 31, 2027. A bid bond equal to 5% of the total bid or an annual bid bond is required before bid opening; proposals are due December 11, 2026.