Opportunity
Wichita Bonfire #260295
Cheney Pump Station 500 kVA Transformer and Electrical System Replacement
Posted
November 20, 2026
Respond By
December 04, 2026
Identifier
260295
NAICS
237110, 335313
The City of Wichita is seeking construction bids to replace the electrical transformer system at its Cheney Pump Station while keeping the facility operating. - Government buyer: City of Wichita — Public Works & Utilities Department; Engineering and the City Purchasing Manager are also identified in the documents. The project is at Cheney Pump Station in Cheney, Kansas. - Scope and bid quantities: Eight lump-sum bid items, each quantity 1: a 500 kVA pad-mounted transformer and 800A switchboard; feeders; miscellaneous electrical work; demolition; a complete site arc-flash and coordination study; concrete pavement; pavement demolition; and miscellaneous plumbing. - Equipment details: The transformer is specified as 500 kVA, 15 kV–480 V. Switchboard MSB-1 is specified as 800A, 480Y/277V, three-phase, four-wire, with a 100,000 AIC rating. No manufacturer, model, or transformer part number is specified. - OEMs and named vendors: No equipment OEMs are named. Professional Engineering Consultants, P.A. is identified as the engineering consultant, not as an equipment manufacturer. No other commercial vendors are named. - Notable requirements: Keep the pump station in operation during construction and coordinate potentially disruptive work with Water Treatment Staff. Provide temporary power for SCADA and other critical loads, and coordinate the cutover so the scheduled shutdown does not exceed 24 hours. Work includes new electrical equipment, feeder connections, removal of existing equipment, testing and commissioning documentation, trenching, and concrete pavement restoration. Specifications include a one-year guarantee. - Performance: Issue the work order within 30 calendar days after award and complete the work within 60 working days after work begins.
Description
The City of Wichita is seeking bids for construction services for its Public Works & Utilities Department. The project replaces the Cheney Pump Station transformer and includes installation of a new 500 kVA pad-mounted transformer, switchboard, feeders, and associated electrical work. Other listed bid items include demolition, an arc-flash/coordination study, concrete pavement, pavement demolition, and miscellaneous plumbing. A 5% bid bond or annual bid bond is required, and the work is to be completed within 60 working days from the start of work.