Opportunity
SBIR / STTR #A214-029
Army SBIR Phase I feasibility study for a metamaterial-based aviation antenna
Buyer
Army SBIR
Posted
May 18, 2021
Respond By
May 18, 2021
Identifier
A214-029
NAICS
541715, 334220
The U.S. Army SBIR is seeking Phase I research into a low-profile aviation antenna using metamaterial technology. - Government buyer: U.S. Army Small Business Innovation Research (SBIR); the specific contracting office is not identified. - OEMs and vendors: None are named in the opportunity. - Requested work: Assess feasibility and develop a preliminary design for a conformal antenna operating in portions of the Ku, K, and Ka bands. - Analyze size, weight, and performance tradeoffs; predict radiation patterns and polarization; define operating scenarios; and assess top, side, and bottom aircraft installations, including rotor-blade masking. - Design considerations include operation in demanding aviation conditions, at least 40 watts of transmission, a 50-ohm coaxial interface with a suitable high-frequency connector, and 28 VDC aircraft power if needed. - Intended aircraft include AH-64E, CH-47F, UH-60M, and Future Vertical Lift platforms. The feasibility report should identify gaps and a path forward. - Anticipated follow-on: The topic describes potential Phase II antenna hardware, completed design, and test results, with possible Phase III transition to production. - Funding and duration: Phase I is six months, with funding up to $256,000.
Description
The Army SBIR Phase I solicitation seeks a feasibility study and preliminary design for a metamaterial-based airborne antenna operating in portions of the Ku, K, and Ka bands. The antenna is intended for Army Aviation platforms and should reduce size and weight while improving bandwidth, reception, gain, and performance in adverse aviation conditions. The Phase I work includes assessing the SWaP/performance trade space, predicting radiation patterns and polarization, and developing aircraft-compatible concepts of operation and installation analyses. The deliverable is a feasibility report covering the stated objectives; the topic also describes Phase II prototype and testing deliverables and anticipated Phase III transition.