The City of Pasadena is seeking a contractor to improve pedestrian crossings at two Green Street intersections. - Buyer: City of Pasadena, Public Works Department, Engineering; Pasadena, Los Angeles County, California. - Scope: Install pedestrian rapid-flashing beacons and related crossing, lighting, electrical, concrete, curb-ramp, signage, and pavement improvements at Green Street and Michigan Avenue and Green Street and Chester Avenue. - Named OEMs and products: - Carmanah Technologies — R920-MX one-sided solar-powered rectangular rapid flashing beacons (RRFBs), quantity 4. - Polara Enterprises — iDX accessible/integrated audible-detection (AID) pedestrian push buttons, quantity 4. - Other major equipment: Two signal poles and foundations; two Type 2 posts and foundations; LED luminaires and replacement lamps; 30 linear feet of galvanized conduit and conductors; two pull boxes; and eight signs. See line items for full quantities and specifications. - Intersection and related work: Remove or relocate existing signs and lighting; replace concrete, install truncated domes, and construct an ADA curb ramp and retaining curb at Chester Avenue; adjust a water valve and install red curb. Alternate #1 includes striping removal and thermoplastic channelization. - Notable requirements: Work must meet applicable accessibility requirements and public-works prevailing-wage and funding provisions. The bid identifies contractor licensing and public-works registration requirements, project-reference requirements, a bid bond, and performance and payment bonds. - Schedule: Base work is estimated at 60 working days; Alternate #1 adds 10 working days. Work is to start within 15 calendar days after the Notice to Proceed.

Description

The City of Pasadena is soliciting bids to install rectangular rapid flashing beacons (RRFBs) at Green Street and Michigan Avenue and at Green Street and Chester Avenue. Work includes signal poles, beacons, conduits, conductors, pull boxes, concrete work, curb ramps, signage, striping, and related improvements. The project has a 60-working-day base duration, with Bid Alternate #1 adding 10 working days. The engineer’s estimate is $144,000–$185,000, and bids are submitted electronically through the City’s eProcurement Portal.

View original listing