Opportunity

Douglas County Ionwave #CI-2026-0160 Addendum 1

Common Ground Recreation and Aquatic Center standing-seam roof replacement

Posted

November 11, 2026

Respond By

December 09, 2026

Identifier

CI-2026-0160 Addendum 1

NAICS

238160

The City of Omaha is seeking construction bids to replace the standing-seam roof at the Common Ground Recreation and Aquatic Center in Elkhorn, Nebraska. - Government buyer: City of Omaha, Department of Parks, Recreation and Public Property, through Douglas County Purchasing; the Park Planning Division is identified in the specifications. - Scope: Remove and replace the existing metal roof and associated insulation, vapor retarder, flashing, gutters, downspouts, and accessories. Roof overlay/recover is prohibited; the existing EPDM roof is excluded. - Named OEMs and specified products: Elevate UNA-CLAD UC-6 Double-Lock standing-seam panels (basis of design); Carlisle SynTec Systems VapAir Seal MD vapor retarder (basis of design); and PPG Amerlock 400 and Amerlock 600 coatings (basis of design). Listed alternatives or approved equivalents are allowed where specified. - Quantities and key specifications: Replace approximately 208 sq. ft. of exposed roof deck with 3-inch, 20-gauge galvanized Type N deck; provide a vented nail-base insulation assembly rated at least R-30; and install specified gutters, downspouts, stainless-steel rail snow guards, and roof-hatch guardrails and gate. Most quantities are not stated. - Bid lines: One lump-sum base bid and one square-foot unit-price line for miscellaneous 2x wood blocking; the attachment identifies the latter as 1 SF. - Notable requirements: Maintain facility access and operations, protect the building from weather during construction, and coordinate with the locker-room renovation. The indoor pool will be closed during construction but remain undrained. The bidder must provide an Economic Sustainability Program plan or approved certificate; a 5% bid security applies at or above the stated bid threshold, and an apprenticeship incentive is available for qualifying labor commitments. - Existing-condition materials: The roof-core information mentions DensDeck Prime, SBS underlayment, polyisocyanurate insulation, and possible Fortifiber paper underlayment; these are existing materials, not specified purchases.

Description

The City of Omaha is soliciting bids for a lump-sum project to remove and replace the existing standing seam metal roof at the Common Ground Recreation and Aquatic Center in Elkhorn, Nebraska. The work also includes replacement of gutters and downspouts; the existing EPDM roof is not included in this bid package. Construction may not begin before March 1, 2027, and the stated completion date is April 30, 2027. Bids must include an Annual Economic Sustainability Program plan or approved certificate, and a bid bond or acceptable substitute equal to 5% of the bid is required for bids of $50,000 or more.

View original listing