Opportunity
SAM #PANMCC27P0000009457
Fort Bragg airfield crash alert system replacement, installation, and sustainment
Buyer
MICC Fort Liberty
Posted
November 20, 2026
Respond By
January 13, 2027
Identifier
PANMCC27P0000009457
NAICS
238210, 334290
The U.S. Army is seeking a turnkey replacement and sustainment solution for crash alert systems at three Fort Bragg airfields. - Government buyer: U.S. Army / U.S. Army Garrison Fort Bragg; DPTMS Airfield Division. Contracting office is Mission and Installation Contracting Command–Fort Bragg (MICC-FB), 900th Contracting Battalion, under the 419th Contracting Support Brigade. - Scope: Replace and modernize the existing FORUM Alert II-based Primary Crash Alarm System (PCAS) and secondary crash alert network at Simmons, Mackall, and Pope Army Airfields. Work includes procurement, installation, integration, validation, testing, training, and sustainment. - Named manufacturers and products: ConsortAlert emergency notification software/consoles and spare kits; Dell servers; Cisco VoIP phones, PTT handsets, PoE switches, and compliant SFP modules; Extreme Networks fiber switches. The system must interoperate with the existing AudioCodes VESTA 911 and NAS voice-recording systems. - Major equipment quantities: 1 20-session VoIP emergency notification system; 2 30-session systems; 1 20-session backup system; 3 UPS units; 6 touchscreen consoles; 37 Cisco CP-8841 MPP phones; 37 Cisco PTT handsets; 28 Cisco C9200CX-8P-2X2G-E PoE switches; 3 Extreme Networks 5420F-24S-4XE fiber switches; 56 Cisco-compliant, TAA-compliant duplex-LC SFP modules; 3 spare kits; and 3 sets of mounting hardware, shelves, and cable management. - Key requirements: DoD/JITC-certified installation by trained ConsortAlert technicians; JITC and cybersecurity/RMF compliance; DoDIN APL and validation readiness information; NEC transport verification; bench testing and non-intrusive cutover at active airfields; warranty and maintenance support. - Schedule and support: Work begins within 30 days after award; delivery and installation are due within 90 days after work starts. Three years of annual support and maintenance begin after acceptance, with a three-year workmanship and materials warranty.
Description
The Directorate of Plans, Training, Mobilization, and Security (DPTMS) at Fort Bragg, NC requires the procurement, installation, and ongoing maintenance of a modernized Primary Crash Alarm System (PCAS) / Secondary Crash Alarm System (SCAS) / Airfield Crash Alarm Emergency System. This effort will modernize the aging FORUM Alert II system across three airfields: Simmons Army Airfield (SAAF), Mackall Army Airfield (MAAF), and Pope Army Airfield (PAAF). All work and technical deliverables shall conform in strict accordance with the specifications set forth in Section 11.0 (Technical Reference).