Opportunity
Michigan VSS #RFP-WAY-270000000367-1
Wayland Union Schools Transportation Building EPDM Roof Recovery or Replacement
Posted
November 20, 2026
Respond By
December 04, 2026
Identifier
RFP-WAY-270000000367-1
NAICS
238160
Wayland Union Schools is seeking bids to recover or replace the roof on Sections C and D of its Transportation Building. - Buyer: Wayland Union Schools, Michigan; no sub-agency or purchasing office is identified. - Scope: Approximately 6,770 square feet total (Section C: 1,450 square feet; Section D: 5,320 square feet). Sections A and B are excluded. - Two separately priced alternatives: approved roof recovery, or removal of existing roofing and insulation to the structural deck followed by full replacement. - Required system: New 60-mil reinforced EPDM roofing, at least 5 inches of compatible insulation (or more if required by code, design, or manufacturer), cover board, flashing, edge components, and other system accessories as needed. - Warranty and OEMs: A minimum 20-year manufacturer roof-system warranty is required. No OEM, manufacturer, or vendor is named; bidders must identify the proposed EPDM system, use a manufacturer-authorized installer, and provide confirmation of warranty eligibility. - Notable work requirements: The recovery alternative includes thermographic surveying and moisture verification; unsuitable or wet materials must be removed and replaced. Full replacement includes deck inspection and new insulation. Both alternatives include required drainage improvements, equipment coordination, inspection, and closeout. - Pricing and delivery: Provide a complete lump-sum price for each alternative and unit prices for wet-insulation and concealed-deck work. Coordinate construction with school transportation operations and protect adjacent roof Sections A and B.
Description
Wayland Union Schools requests sealed bids for roof improvements to Sections C and D of its Transportation Building, approximately 6,770 square feet total. Bidders must submit separate complete lump-sum prices for an approved roof recovery option and a full removal and replacement option; both require a new 60-mil reinforced EPDM roof system and specified 20-year manufacturer warranty. Attendance at the December 1, 2026 pre-bid walkthrough is mandatory, and proposals are due by December 4, 2026, at 10:00 a.m. Eastern, by sealed hard-copy delivery. Work is scheduled for spring 2027, with completion and closeout required by June 30, 2027.