Opportunity
Miami University and Ohio University Ionwave #1120262509
Miami University CSC Golf Facility Phase 1 Renovation and Golf Simulator Equipment
Posted
November 20, 2026
Respond By
December 11, 2026
Identifier
1120262509
NAICS
236220, 238290
Miami University is seeking a general contractor to renovate space for its CSC indoor golf training facility in Oxford, Ohio. - Buyer: Miami University; Physical Facilities Department, Facilities Contracting Office, and Strategic Procurement. The bid invitation identifies Jenny Wethington in Strategic Procurement. - Project: CSC Golf Facility Phase 1, project MUN-270178; a 4,345-square-foot conversion of former bakery/factory space into an indoor golf training facility. - Construction scope: General trades, interior renovations and finishes, fire protection, plumbing, HVAC/temperature controls, electrical, and data/IT work. - Golf systems and named providers: Platform Golf is identified as the golf contractor. The equipment schedule includes TrackMan systems and golf simulator and putting equipment. Named manufacturers include TrackMan, Interface (flooring), Yaskawa (variable frequency drives), and Trane (existing building controls system). - Equipment quantities: 4 infrastructure PCs; 1 cabling system; 5 SAM ball-tracking cameras; 7 touchscreen monitors; 2 large-format displays; 3 simulator enclosures; 5 4K projectors; 6 swing cameras; 1 TrackMan IO Duo; 2 TrackMan IO units; 1 floorbox; and 4 Platform Golf control units. - Other specified products: Interface vinyl tile and carpet tile, plus Yaskawa drives for existing air-handling units AHU-3 and AHU-4. The documents do not provide quantities or part numbers for these items. - Notable requirements: Maintain adjacent building occupancy and egress, coordinate work with university operations, and use dust containment and HEPA filtration. Modify and test fire protection systems; provide an operational plumbing system; and extend the existing Trane controls system. Butler County prevailing wages apply, and the project has a 5% EDGE participation goal.
Description
Miami University is seeking bids for Phase 1 of the CSC Golf Facility project. The work is a 4,345-square-foot change of use and interior renovation to convert factory space into an indoor golf training facility, including general trades, interior finishes, fire protection, and related mechanical and electrical work. Prevailing wage rates for Butler County apply to trade labor, and bids must be submitted on OFCC forms included in the front-end documents. A pre-bid meeting is scheduled for December 2, 2026, at the Cole Service Building in Oxford, Ohio.