Opportunity

Missouri BUYS #MODOT 0000000438SL,3

MoDOT salt dome roof replacement and related repairs in St. Joseph

Posted

November 19, 2026

Respond By

November 24, 2026

Identifier

MODOT 0000000438SL,3

NAICS

238160, 423330

MoDOT is seeking a complete roof replacement for two salt domes in St. Joseph, Missouri. - Government buyer: Missouri Department of Transportation (MoDOT), Procurement Unit 31-MODOT Transportation; the specifications also reference the District Engineer and District Facilities Manager. - Project scope: Replace roofing on salt domes approximately 82 and 100 feet in diameter. Remove existing foam roofing, shingles, felt, vents, flashing, and entrance fascia; repair damaged rafters and roof framing; and install complete, watertight roof systems. Replace up to 30 sheets of damaged sheathing across both buildings, with additional sheets priced separately. - Primary materials: Manufactured-warrantied architectural shingles rated for at least 30 years, ice-and-water protection, synthetic underlayment, galvanized flashing, replacement roof vents, and materials for entrance roof and siding work. The specifications also include sheathing, building wraps and membranes, metal roofing and wall panels, trim, snow guards, and sealants. - Named manufacturers and products: DuPont (Tyvek), Central States (Panel-Loc Plus and DripX basis-of-design panels), GAF, CertainTeed, TAMKO, Georgia-Pacific, Air Vent Inc., Midwest Manufacturing, and Homex. The shingle specification allows the named manufacturers or approved equals. - Notable requirements: Shingle warranties of at least 30 years; metal-panel warranties of 40 years for paint adhesion, 30 years for chalk and fade, and 20 years against Galvalume perforation; snow retention rated at least 500 pounds per linear foot; and replacement or repair of damaged framing and sheathing. The vent reference “750” is a model number, not a quantity; each existing vent is to be replaced. - Schedule: Work begins after the Notice to Proceed and must be accepted by the stated project completion deadline. The completion period includes 15 days for submittals; no option years or annual subscription are described.

Description

MoDOT seeks qualified bidders to remove existing roofing materials, vents, flashing, and entrance fascia from the salt dome structure down to the decking. The awarded bidder will install warranted architectural shingles rated for 30 years or greater, an ice and water barrier, synthetic underlayment, galvanized flashing, and 750 metal roof vents, plus other items needed for a complete, watertight roof system. Bids may be submitted electronically or by mail, UPS, or FedEx; hard-copy bidders must contact the buyer five business days before bid closing. Attendance at the site visit is mandatory for bids to be accepted.

View original listing