Opportunity

Saskatchewan Tenders #COR26-00026

Heritage Neighborhood Storm Sewer and Detention Pond Construction

Posted

November 19, 2026

Respond By

December 22, 2026

Identifier

COR26-00026

NAICS

237110, 237990

The City of Regina’s Heritage Drainage Upgrades – Phase 1 is a municipal civil-works project to improve stormwater capacity and reduce flooding in the Heritage Neighborhood. - Government buyer: City of Regina, Procurement Branch; project consultant: AECOM. - OEMs and vendors: No manufacturers or bidding vendors are identified. AECOM is named as consultant, not as an OEM or bidder. - Main scope: Construct approximately 40,000 m³ of Detention Pond E1 and about one kilometer of storm sewer, using both trenchless and open-cut methods. Install reinforced-concrete and PVC storm sewer, PVC sanitary sewer, catchbasin leads, and precast concrete vaults and manholes; complete connections, excavation, dewatering, traffic accommodation, and surface restoration. - Notable quantities: 485.1 m of 1650 mm C76-V trenchless storm sewer, 212.8 m of 1500 mm C76-V trenchless storm sewer, 33.8 m of 1350 mm C76-V trenchless storm sewer, and 10 m of 375 mm PVC sanitary sewer. The schedule also includes CCTV inspections, utility crossings, and geotechnical monitoring. - Notable requirements: Handle an estimated 2,400 m³ of impacted soil in the Soil Management Zone and use nitrile gaskets on specified pipes and structures there. Submit environmental protection, shoring, cold-weather pipe installation, and pond dewatering plans. Trenchless construction experience, project scheduling and risk mitigation, safety documentation, surety bonds, and Indigenous participation and sustainability information are also required. - Performance: Substantial Performance is required during 2027; Total Performance is due within 30 calendar days after Substantial Performance unless the City allows otherwise. A two-year warranty period begins at Substantial Performance.

Description

The City of Regina is seeking proposals from experienced companies for Phase 1 of municipal drainage upgrades in the Heritage Neighborhood. The work includes increasing stormwater drainage capacity and storage, constructing part of detention pond E1, and installing storm sewer using trenchless and open-cut methods. Deliverables include reinforced concrete and PVC storm and sanitary pipes, precast concrete structures, and detention pond excavation. The intended project completion date is October 22, 2027; proposals have separate technical and pricing submission deadlines.

View original listing