Opportunity

Mobile Cityofmobile #ME-008-26

Wet demolition, debris removal, utility capping, and site restoration

Posted

November 19, 2026

Respond By

November 24, 2026

Identifier

ME-008-26

NAICS

238910

The City of Mobile is seeking a stipulated-sum quote for nuisance-abatement demolition and restoration at a property on Stewart Avenue. - Buyer: City of Mobile, Municipal Enforcement Department. - Work: Wet-demolish and remove structures, footings, slabs, debris, tires, trash, roof remnants, and designated waste; clear specified vegetation and small trees; fill disturbed areas; and leave the aluminum fence in place. - Utilities: Disconnect and cap utility lines, including water, gas, and sewer; cap the sewage line at the curb. - Site controls and restoration: Provide erosion, sediment, and dust controls, permanent stabilization, and grassing/seeding. - Environmental requirements: Lead-based paint or asbestos-containing materials may be present. Dispose of applicable waste at a permitted landfill and provide waste-shipment records. - Closeout: Submit before-and-after and required work-verification photos, invoices, and other closeout documents. - Timing and performance: Begin permitting within three business days after the written Notice to Proceed; complete the work and submit required records within 30 calendar days. Liquidated damages may apply for late completion. - OEMs, manufacturers, and vendors: None are named. No manufactured products are specified.

Description

The City of Mobile is requesting quotes for wet demolition and removal of structures at 1550 Stewart Ave, formerly 1551 Forrest St., Mobile, Alabama. Work includes removing footings, slabs, debris, and specified site vegetation; disconnecting and capping utility lines; and providing erosion and sediment controls, site stabilization, and seeding. The contractor must follow requirements for demolition where lead-based paint or asbestos may be present and provide specified waste records, photographs, invoices, and close-out documents. Quotes are due November 24, 2026, at 11:00 a.m.; the work must be completed within 30 calendar days after the written Notice to Proceed.

View original listing