Opportunity

San Mateo Opengov #2027-RFP-00118

County Office Building 1 Renovation and Modernization — Work Package 2

Posted

October 14, 2026

Respond By

November 24, 2026

Identifier

2027-RFP-00118

NAICS

236220, 238160

San Mateo County is seeking a general contractor to renovate and modernize County Office Building 1 under Work Package 2. - Buyer and project: County of San Mateo, Department of Public Works — Public Works - Capital Projects; County Office Building 1, Redwood City; Project No. P33Z1. - Construction scope: Renovate part of Level 1 and all of Level 2, including hazardous-material abatement, demolition, partitions, ceilings, lighting, doors, finishes, and mechanical, electrical, plumbing, and technology work. Scope also includes basement system modifications, fire alarm and suppression, conference-room audiovisual, expanded access control, and limited signage. - Named OEMs and products: Tremco roofing products; Summit refrigerators (ALR46W and FF708BL7SSADA); Culligan Quench 960 and Quench Q5 water coolers; GE GTE18GTN refrigerator; Samsung RS28A500ASR refrigerator; Sharp SMC2266KS microwave; InSinkErator HOT250 hot-water faucet; Toshiba STUDIO 2525AC copier; Quadient DS-64i folder inserter; Georgia-Pacific Dens Deck Prime cover board; and Connectrac workroom system. A toaster oven is listed with manufacturer and model TBD. Equipment quantities are not stated. - Flooring and roofing: Resilient VCT and LVT and carpet tile are specified to match project finish schedules. The Tremco built-up roofing system includes POWERply Endure 100 with Rock-It WB surfacing and associated membranes, adhesives, insulation, flashing, and walkway products. No installed quantities are stated. - Notable requirements: The building will remain occupied; maintain utilities and coordinate around active areas and the operational Data Center. Meet applicable accessibility, safety, and building requirements. Roofing requires a 30-year manufacturer warranty and two-year installer warranty; carpet tile requires a 10-year manufacturer warranty, two-year installer warranty, and extra stock; resilient flooring requires extra tile equal to 2% of installed product. - Value and duration: Estimated value is $13 million–$15 million. The contract period is 204 calendar days, with Level 1 substantial completion required within 125 days; no option years or annual subscription are stated.

Description

The County of San Mateo Department of Public Works is seeking a general contractor for renovation and modernization at County Office Building 1, 455 County Center, Redwood City, California. The work includes interior remodeling of part of Level 1 and all of Level 2, including abatement, demolition, partitions, ceilings, lighting, doors and hardware, finishes, and mechanical, electrical, and plumbing systems. Additional scope includes basement system modifications and connections, fire alarm and suppression systems on Levels 1 and 2, conference room audiovisual, expanded access control, and limited signage. The building will remain occupied, and the stated contract duration is 204 calendar days from the anticipated Notice to Proceed.

View original listing