Opportunity

SAM #36C26327Q0123

VA market research for bat mitigation and attic restoration at Building 65

Buyer

VA Health Administration Center 23 (VHA NCO 23)

Posted

November 19, 2026

Respond By

November 30, 2026

Identifier

36C26327Q0123

NAICS

561710

The Department of Veterans Affairs seeks market information for bat mitigation and attic restoration at Building 65 of the Black Hills VA Health Care System. - Government buyer: Department of Veterans Affairs; Black Hills VA Health Care System; Network Contracting Office 23. - Opportunity: Sources-sought market research for turnkey bat abatement and attic restoration; no award is planned under this notice. - Services requested: Humanely exclude bats using one-way devices, seal exterior entry points and interior openings, and confirm bats are no longer present. Remove and dispose of guano and contaminated insulation, then clean and disinfect the space. - Product requested: Blown-in cellulose insulation rated at least R-49 after settling; quantity and part number are not specified. - Notable requirements: Treat guano with TB-Cide Quat; use respiratory protection and dust-containment/infection-control measures; obtain VA approval for cleaning chemicals; follow applicable bat-conservation guidance and Endangered Species Act Section 7 requirements.

Description

The Black Hills VA Healthcare System requires bat mitigation and exclusion services in accordance with the draft Statement of Work (SOW) below. This is a sources sought looking for vendors to perform the services per the SOW for market research purposes. No awards of a contract will be made from this announcement. If you are a vendor that can complete the work described in the SOW with competitive pricing, please send your contact and organization information with a descriptive proof of capability to: Jeffrey.Brown8@va.gov on or before November 30th, 2026. Only emailed responses will be considered. Additionally, please provide answers as appropriate to the following questions in the table below with your response to this sources sought. Failure to respond to the following questions may affect the acquisition strategy. Question #QuestionsVendor Responses 1.Identify your organization's socio-economic category. 2.State whether any of the requested services may be ordered against a government contract awarded to your organization (e.g. Federal Supply Schedule (FSS), General Services Administration (GSA), etc.). 3.State if subcontracting is contemplated for this requirement, what percentage of the work will be subcontracted and for what tasks. If applicable, VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses or Service Disabled Veteran Owned Small-Businesses. If applicable, FAR 52.219-14 Limitations on Subcontracting, will apply to the potential solicitation if set-aside for Small-Businesses.

Draft Statement of Work (SOW) Building 65 Bat MitigationBlack Hills VA Health Care System at Fort Meade, South Dakota General Intention: Contractor shall provide all supervision, tools, labor, materials, hardware, equipment, transportation, and incidentals necessary to complete a turnkey finished project for the following services: Professional bat abatement in attic of Building 65. Remove bat colonies, conduct bat proofing/exclusion, remove bat guano and insulation (sterilize as needed), sanitize the area, and reinstall insulation. Building 65 is a 2-story building with the attic above.

General Requirements Contractor shall provide all supervision, labor, materials, equipment, and incidentals necessary to accomplish work elements and requirements outlined in this Statement of Work (SOW). Where equipment, temporary installations, ingress/egress restrictions or any other consideration is necessary, signage in such areas shall be provided by Contractor. The Contractor shall confine all staging activities within the anticipated construction area. Contractor shall coordinate proposed staging areas with the facility representative for approval. The Contractor shall field verify all existing conditions, dimensions, and quantities prior to any work activities. Time and date to be coordinated with facility representative. Any work that is not addressed by the contract shall immediately be brought to the attention of the Contracting Officer. No out-of-scope or additional work shall be executed prior to modification of the contract by the Contracting Officer. Contractor shall remove all rubbish from the Fort Meade property and dispose off site following VA Specification 01 74 19 Construction Waste Management. Contractor shall record all quantities of materials removed from the Fort Meade property and turn into the facility representative monthly reports even if a null report. Contractor to perform all work during normal work hours, Monday through Friday 7:00 am to 4:30 pm Mountain Time except as coordinated with the facility representative for any activities that may need to occur outside of normal working hours at no additional cost to the Government. The requirements of this SOW supplement other related VA standards for construction, space and facility planning criteria, design guides, design manuals, specifications, and details, which remain in full force and effect. Specifically, all requirements of VA handbook 0730, NEC 517, NFPA Health Care Facilities Code for Branches, Security and Law Enforcement, Appendix B, (which covers physical security requirements for VA facilities), the VA fire Protection Design Manual (which covers all VA construction), and ICT standards on the TIL remain in effect. Work Elements: Which shall include and are not limited to: All supervision, tools, labor, materials, hardware, equipment, transportation, and incidentals necessary to complete a turnkey finished project.

Bat Exclusion Bats need to be permanently excluded from roosting in the VA building 65 using non-lethal exclusion methods following Bat Conservation International (BCI), South Dakota Game, Fish and Parks recommendations, and comply with section 7 of the Endangered Species Act. The technique includes using one-way exit devices (industry preferred exclusion tubes VA approved), sealing points of entry, interior and exterior of the building, and preventing access to the building interior. Exclusion activities will be conducted when bats are not present if feasible; this timing will also ensure that activities occur before the Maternity and Roost season. Bat removal shall occur between February 1st, 2027 and April 15th, 2027. Exclusion may not be done when pups are too young to fly (June-August). Change to these timelines may be proposed and accepted after discussion and approval by the designated facility representative(s) and contracting officer. One-way exit devices through which bats can leave but cannot return are made from tube-type excluders which are placed at all active entry points. Exclusion tubes should have a diameter of two inches, a length of 10 inches with a smooth surface and should project no more than one-quarter inch into the opening. Once the tube has been secured over the hole, a piece of lightweight, clear plastic can be taped around the tubes outside end to further reduce the likelihood of bats reentering, though this may not be necessary. Multiple exclusion tubes may be required. Lightweight, flexible plastic netting with one-sixth-inch mesh or smaller can be used to form a one-way valve over openings on smooth surfaces of exterior walls or attic louvers. The one-way exit devices will remain in place for at least five to seven days. The devices will be removed after all bats have been confirmed to be excluded. Night observation and other means, may be needed when determining if bats are still entering or leaving the building. It must be confirmed by visual inspection or other that bats are no longer present.

Sealing Exclusion Points Exclusion points will be sealed with OSI silicone sealant, caulk backing rod, hardware cloth or heavy-duty polypropylene mesh, flashing out required areas around roofline with proper metal for optimal coverage. If one-way exit devices have been used, sealing will be conducted after the five-to-seven days that the devices have been in place. Bats can enter buildings or living spaces through openings as small as 3/8" diameter. Focus points include but not limited to trim, soffits, chimneys, and dormers. All metal on the front roofs will be properly sealed and securely screwed down where required to prevent Bat re-entering the building. Appropriate screws designed for metal, equipped with washers to prevent leaks will be used, and sealed to prevent future water damage.

Preventing Building Interior Access The building's interior will be inspected for small openings through which bats could enter. Bats can enter buildings or living spaces through openings as small as 3/8" diameter. All openings connecting potential roosting areas to living quarters need to be sealed.

Methods not to be used for bat exclusion: Simply waiting for bats to fly out at night and then permanently sealing the entrances without the use of one-way exit devices. Ultrasonic devices, chemical repellents, smoke, canned spray foam, and traps will not be used to evict the bats from the building.

Guano, Old Insulation Removal, Cleanup, and Precautions Bat guano may contain spores of the fungus Histoplasma capsulatum which can cause Histoplasmosis, a respiratory disease. For precautionary purposes during guano cleanup, avoid exposure to histoplasmosis by wearing a respirator capable of filtering particles as small as 2" in diameter or use a self-contained breathing apparatus when cleaning or entering areas with guano. TB-Cide Quat must be applied to the bat guano to neutralize spores and prevent their release during the cleanup process. Extraction of all contaminated insulation and guano will be securely bagged in Hazardous Waste Bages and removed from the premises and disposed off site at an approved location that accepts this type of rubbish. Contractor shall follow the Infection Control Risk Assessment (ICRA) requirements: Perform work activity in a manner that does not create dust. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system). Ensure worker clothing is clean and free of visible dust before leaving the work area. Seal doors to prevent dust migration. All plastic barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route. Install a sticky (dust collection) mat at entrance of contained work area. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily. Work under this section shall be completed prior to June 15th, 2027.

Cleaning and disinfecting the space After the bat guano and old insulation has been removed, the space will need to be cleaned and disinfected prior to the installation of new insulation. Maintain Manufactures recommendations for cleaning solutions and chemicals. All must be submitted for VA approval before use.

Replacement insulation Insulation will be replaced with blown in Cellulose insulation equal or greater than R49 value after settling.

Quality control and Acceptance QUALITY CONTROL: The Contractor shall have a quality control program to assure the requirements of this contract are completed as specified. The Contractor and facility representative will inspect the work. Deficiencies will be noted and corrected before beginning work in another area. Any damage done by Contractor will also be noted and corrected by the Contractor within 2 working days. Damage causing an immediate impact on the environment or the building shall be corrected immediately. Extensions to repair deadlines are allowable after receiving permission from the Contracting Officer. QUALITY ASSURANCE: The Government will evaluate the contractor's performance under this contract. All surveillance observations will be recorded by the Government. When an observation indicates defective performance, the facility representative will document the defective performance and notify the Contracting Officer.

References References for policies to adhere to during duration of project, available at http://www.cfm.va.gov/til/spec.asp. VA Specifications Federal, State, and Local Government Agencies NFPA PSDRM Building Pictures

Post Award Requirements Project kick-off meeting: The Contractor shall plan for an on-site project kick-off meeting with VA staff to walk the site and review the schedule.

View original listing