Opportunity
Vallecitos Water District Planet bids #148349
Secondary Basin No. 4 sludge collector refurbishment
Posted
November 18, 2026
Respond By
December 11, 2026
Identifier
148349
NAICS
237990
Vallecitos Water District is seeking a contractor to refurbish the Secondary Basin No. 4 sludge collector in San Marcos. - Buyer: Vallecitos Water District, Operations and Maintenance department; San Diego County, California. - OEMs and vendors: Evoqua/Xylem is identified as the source of owner-furnished replacement materials. Honeywell is identified for the 11CX12 limit switches. - Work requested: Remove and dispose of existing collector components; install and align owner-furnished components; perform electrical and controls work; and complete startup, commissioning, and testing. The District provides basin dewatering, cleaning, sludge removal, access, staging, and replacement materials. - Key quantities: 32 flight channels and hardware kits; 120 return wear shoes; 414 wear strips across two line items; 350 each of several fastener items; one collector chain; one gearmotor; and the other components listed below. The parts list contains entries with unclear table alignment, noted in the relevant item descriptions. - Separate contingency: Price stub-shaft removal and replacement separately. It may proceed only if a deficiency is found and the District gives written authorization. - Notable requirements: Contractor supplies labor, supervision, tools, equipment, rigging, confined-space entry, installation, testing, and related incidentals. The contractor must hold a California C-12 license, have at least five years of relevant experience and three comparable completed projects, and meet prevailing-wage and applicable off-road fleet requirements. Complete the work within 60 calendar days after Notice to Proceed.
Description
The work involves removing and replacing components of the Secondary Basin No. 4 sludge collector using materials furnished by Vallecitos Water District. The contractor will perform mechanical demolition, install owner-furnished collector components, complete electrical work, and provide startup, testing, and commissioning. Existing stub shafts are to remain in service unless deficiencies are found during demolition; any replacement would be a separately priced contingency requiring written District authorization. Work is to be completed within 60 calendar days after the Notice to Proceed.