The City of Ames is seeking a contractor to renovate the CyRide Steam Clean Bay and prepare the facility for an Owner-provided transit bus lift. - Buyer and project: City of Ames, Iowa, through Ames Transit Agency (CyRide); work is at the CyRide facility in Ames. - Construction scope: Renovate the steam clean bay, including selective demolition, concrete and utility work, new finishes, and plumbing, electrical, and compressed-air modifications. Coordinate work in the occupied facility and connect the Owner-provided lift. - Major equipment: One 100-GPM oil/sand separator with oil-level monitoring and alarm; a duplex sewage-pump system with two 50-GPM pumps rated at 28 feet of head; and one new Hotsy hose reel, part number 91220060. The lift manual identifies O.ME.R. N.A. Inc. and the KAR/KAR350 lift; the lift is Owner-provided. - Building products: Specified products include Extrutech Plastics P2400 PVC wall liner panels, Type 316 stainless-steel doors and frames, aluminum window-wall assemblies, insulating glass, and IP66 washdown-rated industrial lighting. Fixture and building-component quantities are generally shown on the drawings rather than stated in the available text. - Named OEMs and product options: Lift: O.ME.R. N.A. Inc.; hose reel: Hotsy; separator: Striem, Zurn, Trapzilla, MIFAB, or Rockford Separators; pump: Zoeller, Barnes, Hydromatic, Goulds, Myers, Weinman, or Liberty Pumps; basin: AK Industries or Fiber Basin Inc.; window systems: Kawneer, Tubelite, or YKK AP; lighting: HE Williams, ILP, Nulite Lighting International, or Lithonia. Additional named manufacturers and models are itemized below. - Notable requirements and alternatives: The separator requires traffic-rated covers and an oil-level alarm; the pump system requires duplex controls, automatic alternation, and a high-water alarm. A 6-inch PVC pathway is required for lift hydraulic piping. Deductive alternatives remove the PVC wall liner panels and related allowance, or retain and repaint existing doors and frames instead of replacing them. - Schedule and value: Substantial completion is required by the deadline stated in the solicitation; overall duration and final completion timing are not provided. Contract value is not stated in the available materials.

Description

The City of Ames is seeking bids for renovation work at the CyRide Steam Clean Bay. Work includes removing and replacing building components and utilities to accommodate an owner-provided transit bus lift, selectively replacing doors and frames and existing clerestory windows, and installing new finishes. Bids must be submitted electronically through AmesBids by December 2, 2026, and include the required bid security and Bidder Status Form. Substantial completion is due no later than April 30, 2027, after award and approval of the contract and performance bond.

View original listing