Opportunity

Santa Barbara Planet bids #5058

Milpas Street crosswalk safety, sidewalk, bicycle, lighting, and streetscape construction

Posted

November 19, 2026

Respond By

December 18, 2026

Identifier

5058

NAICS

237310, 238210

The City of Santa Barbara is seeking a contractor for a major Milpas Street pedestrian, bicycle, streetscape, lighting, and traffic-safety upgrade. - Buyer: City of Santa Barbara, Public Works Department, Engineering Division. - Project area and scope: Milpas Street from near Canon Perdido Street to near Quinientos Street. Work includes curb extensions, ADA-compliant ramps, sidewalk and curb repairs, crosswalk improvements, corridor lighting and traffic signals, buffered bike lanes between Cota and Canon Perdido Streets, bicycle parking, drainage, landscaping, and utility relocations. - Named manufacturers and vendors: Fibrelyte lids are specified for certain pull boxes. Caltrans and the City are referenced for standard designs, not as product suppliers; PlanetBids is named as the bid platform. No other commercial OEMs are identified. - Scale and duration: Estimated construction cost is $8 million. Final completion is required within 320 working days after Notice to Proceed; another contract section states 160 days, so the documents conflict. The stated 320-day requirement is the one identified in the notice and project summary. - Notable execution requirements: Maintain traffic, pedestrian, bicycle, and signal access; stage construction; conduct public outreach; coordinate with utilities and concurrent work; verify utility locations and protect shallow fiber-optic ducts. Prevailing wage and a California Class A General Engineering Contractor license are specified. - Major quantities: 25,193 sq. ft. of new 4-inch concrete sidewalk; 18,455 sq. ft. of concrete access ramps; 2,167 linear ft. of curb and gutter; 16 24-inch-box street trees; 63 Caltrans No. 6 pull boxes; and 1,013 linear ft. of 2-by-3-inch conduit under sidewalks or at street crossings in the bid schedule, plus HSIP quantities. - Standards and features: Caltrans signal-pole and pull-box standards, City light-pole standards, PVC or HDPE conduit, thermoplastic markings, green MMA bicycle-conflict markings, and rectangular rapid flashing beacon infrastructure are included. - Bid schedule detail: The line items below retain the quantities stated in the provided bid schedule and attachment summaries; quantities shown in distinct schedule sections are kept separate where their scopes may differ.

Description

The City of Santa Barbara is seeking bids for safety and streetscape improvements along Milpas Street, from approximately west of Canon Perdido Street to east of Quinientos Street. Work includes curb extensions, ADA-compliant curb ramps, sidewalk, curb and gutter repairs, corridor lighting improvements, leading pedestrian intervals, upgraded striping, buffered bike lanes between Cota and Canon Perdido Streets, and bicycle parking. The contract duration is 320 working days, and bids are submitted electronically through PlanetBids. Award will use a Best Value – Competitive Negotiation process, with evaluation based on price and qualification points.

View original listing