Opportunity
New York State Contract Reporter #RFB#26-0016
Troy water-treatment plant corrosion-control and infrastructure upgrades
Posted
November 13, 2026
Respond By
December 21, 2026
Identifier
RFB#26-0016
NAICS
237110, 237990
The City of Troy is seeking bids for corrosion-control optimization and extensive water-treatment plant upgrades across its basin, chemical-feed, electrical, and mechanical systems. - Government buyer: City of Troy, New York — Department of Public Utilities; Office of the City Comptroller, Bureau of Contracts & Procurement / Purchasing Office. - Scope: Corrosion-control treatment optimization and construction upgrades under General, Electrical, and Mechanical contracts. Work covers all eight flocculation and sedimentation basins, the chemical storage area, and related plant systems. - Major equipment: Replace eight chain-and-flight sludge collector mechanisms and eight 24-inch-square influent sluice gates; provide an orthophosphate storage and feed system. Other specified items include access hatches, handrails and guardrails, fencing and gate, stairs, cover plates, fire suppression, and an air-handling unit replacement. - Named OEMs and specified equipment: Daikin heating and ventilating unit CAH006GDGM (1); Plastec exhaust fan P20SS4P033 (1); transformer T-CHEM (1), with approved models from Square D (EXN30T3HCUNLP), Maddox (MIT-DRY-102-CU), or Eaton (V48M28T3016CU-US). No quantities are specified for the orthophosphate system, hatches, rails, fencing, or cover plates. - Basin and site work: Basin coatings and repairs include expansion-joint repairs (8 Type A and 42 Type B), crack repairs (1,000 horizontal, 2,650 vertical, and 351 construction-joint), unsound-concrete repairs (7,940), deep concrete spall repairs (50), topping-slab removal and repair (250), and embedded-channel replacement (1,152). Bid items also include eight handrail/fence replacements, eight temporary scaffolding units, and eight sluice-gate replacements. Units for repair quantities are not stated in the supplied summaries. - Other specified services and alternates: Chemical-storage floor repairs; chimney inspection and video; video inspection of two specified 8-inch drain lines; north and south basin veneer work, south basin east-wall repair, chimney repair, stair replacements (2), and additional basin wall coatings. Bid forms include general contingency and lead/asbestos removal allowances. - Notable requirements: Submit a phased construction sequence; no more than two basins may be out of service at once. Collector mechanisms are anticipated 20–36 weeks after shop-drawing approval. Concrete repairs are subject to temperature and seasonal restrictions. The documents cite prevailing-wage, SRF, AIS/BABA, and 20% MWBE requirements; the design documents are marked for regulatory review and not for construction. - Schedule and term: Per-item pricing is guaranteed for one year, with up to two additional one-year extensions by mutual agreement. Construction documents contain conflicting completion milestones. This is construction work, not an annual software or service subscription.
Description
The City of Troy is seeking bids to establish a price for corrosion control treatment optimization for its Department of Public Utilities. The scope includes water treatment plant infrastructure and corrosion control treatment optimization upgrades, with specifications and drawings provided in the bid documents. The contract term is one year, with per-item prices guaranteed for twelve months from award. Addendum #1 extended the bid deadline to December 21, 2026, at 11:00 AM, and the question deadline to December 14, 2026, at 2:00 PM.