Opportunity
Alaska Online Public Notices #POA-2026-00356 v1.0
Water-quality certification review for American Cruise Lines’ Petersburg cruise ship dock
Posted
November 18, 2026
Respond By
December 19, 2026
Identifier
POA-2026-00356 v1.0
NAICS
237990
This is an environmental permitting notice for the proposed American Cruise Lines Petersburg Cruise Ship Dock, not a solicitation for goods or services. - Government agencies: Alaska Department of Environmental Conservation (DEC) is reviewing the Clean Water Act Section 401 water-quality certification request; the project is associated with a U.S. Army Corps of Engineers (USACE) permit. - Named organizations: American Cruise Lines is the applicant; R&M Engineering Ketchikan represents it. ICE is the named manufacturer of the pile-driving hammer. - Project infrastructure: One 24-by-160-foot concrete moorage float, one 10-by-100-foot aluminum pedestrian transfer bridge, four 36-inch floating fender dolphins, three steel pile frames, and six 24-inch steel piles. The notice describes eight piles, while the application materials specify six. - Equipment and work: Piles will be installed using vibratory and impact hammers. The named vibratory hammer is the ICE Model 216B, rated at 50 tons of driving force. - Monitoring and environmental measures: A certified Protected Species Observer will monitor marine wildlife during in-water work. Measures include minimizing turbidity and sediment disturbance, avoiding sensitive fish habitat and eelgrass where practicable, and containing spills and debris. Dredging and fill are not proposed, and compensatory mitigation is not anticipated. - Schedule: In-water construction is expected to take approximately four weeks, planned for March; exact start and end dates are not stated here.
Description
The Alaska Department of Environmental Conservation is providing notice of an application for state water quality certification for the American Cruise Lines Petersburg Cruise Ship Dock project. The proposed work is deep-water berthing infrastructure in Wrangell Narrows, including a moorage float, pedestrian transfer bridge, floating fender dolphins, and steel piles. Piles will be installed using vibratory and impact hammers, with a Protected Species Observer monitoring in-water operations. Public comments and requests for a hearing concerning water quality are accepted through December 18, 2026.