Opportunity
Utah Public Procurement Place U3P #SLCo FAC134232
Salt Lake County jail HVAC replacement, controls modernization, and related construction
Posted
November 18, 2026
Respond By
December 17, 2026
Identifier
SLCo FAC134232
NAICS
238220, 238190
Salt Lake County Facilities Management is seeking a contractor to replace and modernize HVAC equipment at the Adult Detention Center Jail in South Salt Lake, Utah. - Buyer: Salt Lake County; Facilities Management Division, with solicitation handled by Contracts and Procurement. - Project: FAC134232, Adult Detention Center Jail Rooftop Unit Replacement, Phases 6–12. Work covers Housing Pods A, C, and D, Jail Support, and the Central Plant. - Named manufacturers and products: Greenheck rooftop and energy-recovery units; Temtrol and Westernaire custom air handlers; Seeley evaporative coolers; Johnson Controls Metasys/BACnet controls; J.R. Smith roof hydrant; and Johns Manville roofing membrane. Plans also specify Dexcell cover board. - Equipment quantities: 24 Greenheck RV-150-25I-2-G2 rooftop units (13,000 CFM each); 12 Greenheck RVE-85-58D-15K-2-A2 energy-recovery units (6,400 CFM each); 10 Jail Support custom air handlers (7 Temtrol and 3 Westernaire); 2 additional Temtrol air handlers; 3 Seeley CW3 evaporative coolers; and 1 J.R. Smith Model 5906 non-freeze roof hydrant. The schedules identify individual equipment tags in the line items. - Controls and building work: Base-bid work extends and modernizes the existing Johnson Controls Metasys building automation system. Add Alternate 2 covers approximately 396 legacy controller replacements with BACnet controllers. Work also includes roof curbs and platforms, HVAC piping and condensate connections, electrical and controls integration, roofing, hydrant piping, and lightning-protection modifications and certification. - Notable requirements: Work must be phased, with each phase operational before the next; at least one functioning RTU must remain available for each Housing Pod Unit. The contractor must provide temporary heating, cooling, and ventilation to maintain 68–80°F, verify field conditions, coordinate crane lifts and rigging, and work within correctional-facility security requirements. The existing roof warranty must be preserved. - Service options and training: Alternate 1 offers a five-year service and maintenance agreement for specified packaged rooftop air handlers, in place of the base-bid two-year agreement and annual renewal options. The equipment vendor must fund factory training for at least two County HVAC employees. - Schedule: The project is allotted 365 calendar days after the Notice to Proceed. The five-year maintenance alternate would begin at Substantial Completion. No specific calendar start or end dates are stated.
Description
Salt Lake County is soliciting construction bids to replace all rooftop units at the Adult Detention Center according to the plans and specifications. The work is identified in the construction documents as Roof Top Unit Replacement, Phase 6–12. Bidders must meet the minimum B-100 license requirement and submit the required forms, bid bond, and online pricing. An optional site visit is listed, with a background check required for access.