Opportunity

Georgia Procurement Registry #PE-61100-NONST-2027-000000150

CMAR services and electric stormwater pump installation at Walker Road Landfill

Posted

November 18, 2026

Respond By

December 17, 2026

Identifier

PE-61100-NONST-2027-000000150

NAICS

237110, 423810

Macon-Bibb County is seeking a construction manager to deliver an electric stormwater pump system at Walker Road Landfill. - Buyer: Macon-Bibb County Board of Commissioners, Macon, Bibb County, Georgia. - Scope: Construction Manager at Risk (CMAR) services for Phase II, working with Engineer of Record Hofstadter and Associates. Work includes design reviews, value engineering, life-cycle cost analysis, scheduling and estimates; trade and supplier procurement; construction management and site safety; permanent power coordination and installation; and removal of the existing diesel pumps after successful startup of the new system. - Specified OEM equipment: One Godwin Dri-Prime Model CD150M pump set, or engineer-approved equal. It is a six-inch, electric-driven, self-priming, skid-mounted centrifugal pump rated for up to 1,700 GPM and 165 feet of total head, with a 50 HP, 1,750 RPM, 460 V, three-phase motor. - Other named equipment: Godwin automatic Dri-Prime air-ejector priming system and a Dodge Powerbase flexible coupling, or similar. Pump specifications include a solids-handling capacity of up to three inches, an open three-bladed cast-chromium-steel impeller, an oil-bath mechanical seal suitable for unlimited dry running, and an integral nitrile-rubber ball-type non-return valve. - Notable qualifications and delivery requirements: The CMAR must be a licensed Georgia general contractor with relevant municipal water infrastructure, electrical utility routing, or pump-station experience and demonstrated financial capacity. The work is to start within 10 calendar days after Notice to Proceed and finish within 30 calendar days after Notice to Proceed, including three workdays for weather, cleanup, and demobilization. - Pricing reference: The solicitation identifies a $300,000 placeholder construction budget for evaluation purposes; it is not stated as a contract ceiling.

Description

Macon-Bibb County is soliciting proposals for Construction Manager at Risk (CMAR) services for Phase II installation of a stormwater pump system at the Walker Road Landfill in Macon, Georgia. Work includes preconstruction collaboration, constructability reviews, value engineering, cost estimates and scheduling, followed by procurement and construction management, permanent power installation, and replacement of the existing diesel-driven pumps with an electric-driven system. Proposals are due December 17, 2026, at 12:00 PM ET, and must be submitted as an original, five copies, and a flash drive. A bid bond of at least 5% of the total base bid is required; the project documents also state that the placeholder construction budget of $300,000 is for evaluation purposes only.

View original listing