Opportunity
City of Sacramento PlanetBids #P151111009
Sacramento bridge construction management, scour repairs, and related engineering and creek-repair work
Posted
November 17, 2026
Respond By
December 11, 2026
Identifier
P151111009
NAICS
237310, 541330
The City of Sacramento opportunity covers construction management and bridge repairs, alongside additional engineering, creek-repair, and cost-proposal work documented in the attachments. - Government buyers - City of Sacramento, Department of Public Works, Engineering Services Division: bridge construction management and bridge-repair procurements. - City of Sacramento, Department of Utilities, Utilities Operations and Construction: Sump 202 Outfall and Elder Creek Repair. - Bridge construction management - Construction management for Tangerine Avenue Bridge over Elder Creek (Project R15222210; Bridge No. 24C-0293) and Watt Avenue Bridge over Arcade Creek (Project R15222209; Bridge No. 24C-0177). - Services include preconstruction support, resident engineering, inspection, materials testing, contract and document administration, quality assurance, schedule and change management, claims support, traffic and safety oversight, environmental and permit coordination, and project closeout. Public outreach is specified for Watt Avenue. - The construction manager must be a California-licensed Professional Civil Engineer. The opportunity states a 5% local business enterprise participation requirement. Construction work is specified as a 45-working-day period after Notice to Proceed; consultant performance is expected to extend from agreement execution through project acceptance. - Construction work and related attachments - Tangerine Avenue repairs include pressure grouting below an abutment footing, slope protection and concrete slope paving, channel-lining replacement, excavation, backfill, and temporary creek diversion. - Watt Avenue repairs include abutment and return-wall extensions, approach slabs and drainage, concrete slope protection, shoring, traffic control, and replacement of a street-light pull box and conduit. - Other attached scopes include urban design and engineering consulting; Sump 202 outfall and channel repairs; and associated outreach, traffic planning, environmental documentation, and administration support. - Named firms and OEMs - Adams & Smith, Inc.; CA Traffic Solution; Construction Bid Source; Fenceworks Rental Systems; HDR Engineering, Inc.; and Mozingo Construction, Inc. are identified as prospective bidders, not selected providers. - No product manufacturer or OEM is identified. - Products and quantities - No manufacturer-specific products or part numbers are requested. Specified construction materials include approximately 402 feet of 6-inch Class B concrete channel, 6-inch Class 2 aggregate base, concrete embankment slab, a #5 pull box, and Type III conduit. Other materials and construction components are described in the line items below; most quantities are not stated. - Notable requirements - Creek work is subject to seasonal, biological, water-quality, and environmental protections. Contractors must prepare and obtain approval for applicable creek-diversion, traffic-control, bypass, erosion-control, and related plans. - The attached cost-proposal forms describe a 10% fixed fee, itemized direct costs without markup, and approval controls for staff changes and overtime. - Value and scope caveat - One attachment reports an approximately $635,951.80 consulting contract total. Other cost-proposal figures describe separate or illustrative task budgets and are not clearly reconciled with that amount.
Description
The City of Sacramento is seeking proposals for construction management services for maintenance projects at the Tangerine Avenue Bridge over Elder Creek and the Watt Avenue Bridge over Arcade Creek. The work includes resident engineering, project inspection, materials testing, contract administration, quality control, traffic management, safety, storm water quality, public outreach, claims mitigation, document control, and construction management. Bridge work includes slope paving and channel lining repairs at Tangerine Avenue, and slope paving reconstruction, end diaphragm extensions, approach slabs, and drainage systems at Watt Avenue. Proposals are due electronically through PlanetBids by December 11, 2026, at 11:00 AM; the pre-proposal meeting is non-mandatory.