Opportunity
Berkeley Cityofberkeley #27-11799-C
Berkeley Adult Mental Health Center ChargePoint EV Charger Installation and Site Improvements
Posted
November 16, 2026
Respond By
December 17, 2026
Identifier
27-11799-C
NAICS
238210
The City of Berkeley is seeking a contractor to install City-furnished EV chargers and complete supporting site and electrical work at its Adult Mental Health Center. - Government buyer: City of Berkeley, Department of Public Works, Capital Projects / Engineering Division. - Bids are received by the General Services Division of the Finance Department. - OEM and equipment: ChargePoint CP6000 Level 2 chargers, furnished by the City: one single-port unit and one dual-port unit. No separate equipment vendor or installer is named. - Both chargers require 32A capacity options and extended charging cords; the dual-port unit also requires single-circuit power sharing. - Custom signs for official City vehicles are also City-furnished; quantity is not specified. - Contractor scope: Site improvements and charger installation, including demolition, grading, drainage, paving, painting, foundations and anchorage, electrical routing and connections, local lockable disconnects, automatic load management, setup, and commissioning. Public-right-of-way work requires a separate engineering permit. - Notable requirements: Automatic load management; charger installation and commissioning; prevailing wages; construction waste planning and tracking through Green Halo; and a First Source Construction Agreement. The engineering estimate is $135,000. - Schedule: Complete within 105 calendar days from commencement, with substantial completion within 90 days. No option periods are stated.
Description
The City of Berkeley is seeking bids for site improvements and installation of EV charging stations at the Adult Mental Health Center. Work includes demolition, grading, drainage, paving, painting, and foundation work for the charger structures, charger installation and coordination, and routing electrical connections from the building power supply. The work is described as electrical work only; work in the public right-of-way is to be handled by Public Works and requires an engineering permit. The engineering estimate is $135,000, and the stated project duration is 105 calendar days.