Opportunity

Virginia's eProcurement Marketplace #IFB-131824

Ruthville wastewater treatment plant replacement and collection-system upgrades

Posted

November 17, 2026

Respond By

December 17, 2026

Identifier

IFB-131824

NAICS

237110

Charles City County, Virginia, is seeking bids to replace the Ruthville wastewater treatment plant and upgrade its collection system. - Government buyer: Charles City County, Virginia. - Primary OEM: Fluidyne — its Owner-Furnished Integrated Surge Anoxic Mix (ISAM) treatment system will be installed on a cast-in-place concrete pad. No other vendors are named. - Requested equipment and infrastructure: - 1 Fluidyne ISAM treatment system; quantity and part number not specified. - 2 low-pressure grinder pump stations with associated piping and equipment. - 1 2-inch force main; quantity not otherwise specified. - 1 buried, 10,000-gallon flow equalization tank. - Chlorine contact tank with chlorination and dechlorination tablet-feed systems; quantity not specified. - 1 prefabricated 10-foot-by-14-foot building for electrical and control panels and an alkalinity chemical-feed system. - Elevated walkway around the treatment tank. - Construction and operating requirements: Build the new facilities alongside the existing plant while keeping the existing plant operational. After startup, testing, and Owner acceptance of the new facilities, demolish and abandon designated portions of the existing plant. - Period of performance and estimated value: Not specified in the available information.

Description

The project replaces the existing wastewater treatment plant serving the Ruthville Service Area of Charles City County and upgrades the associated collection system. Work includes two low-pressure grinder pump stations, piping and a force main, a buried 10,000-gallon flow equalization tank, treatment equipment, a chlorine contact tank, and a prefabricated building for electrical, control, and chemical feed systems. The existing plant must remain operational during construction, and designated portions will be demolished and abandoned after startup, testing, and Owner acceptance of the new facilities. Bidders should review the construction sequencing requirements in the Contract Drawings before submitting bids.

View original listing