Opportunity
Douglas County Ionwave #CI-2026-0166
Upgrade of Omaha Fire Department Kidde T-1000 Fire-Training Gas Burn System
Posted
November 18, 2026
Respond By
December 16, 2026
Identifier
CI-2026-0166
NAICS
423830
The City of Omaha is seeking a contractor to modernize the Omaha Fire Department’s gas-fired fire-training system at the Omaha Public Safety Training Center. - Government buyer: City of Omaha; Omaha Fire Department (OFD); City of Omaha and Douglas County Purchasing Department. Buyer contact identified in the attachment: Tamara Hibbert, Buyer II. - Existing system OEM: Kidde — the facility has Kidde T-1000 gas-fired fire-training systems. No replacement-equipment manufacturer or vendor is specified; the contractor must identify the proposed PLC platform and gas detectors. - Products and quantities: - 3 burn-room control systems serving the storage-area, kitchen, and bedroom fire scenarios. - 2 flashover control systems. - A current, commercially supported industrial PLC platform and related control equipment to replace the PLC-5-based system; quantity and part numbers are not specified. - Infrared gas-detection assemblies; quantity and part numbers are not specified. - Services: Inspect, engineer, program, install, integrate, test, and commission the upgraded systems; conduct live-fire testing; train OFD instructors and maintenance staff; and provide project documentation and closeout materials. - Notable requirements: Meet NFPA 1400, Chapter 9; retain all required automated safety functions, including gas detection, flame supervision, interlocks, and emergency shutdowns. Provide simplified instructor controls for manual fire start/stop and flame-level adjustment, and eliminate automatic flame-behavior effects. Include updated drawings, software and backups, manuals, calibration and maintenance information, warranty details, and preventative maintenance schedules. - Performance period: One-time project. No project duration or completion date is specified; the contractor must propose a schedule.
Description
The City of Omaha is requesting proposals from qualified companies for the OFD Fire Tower Upgrade Gas Burn System. The RFP requires bidders to submit a technical proposal and a separate cost proposal through Response Attachments; there are no pricing lines in the Line Items tab. A $50 bid bond or permitted substitute is required, with a copy uploaded with the response and the original delivered to the City Clerk within seven calendar days after closing. The solicitation also requires specified compliance forms, insurance documentation, and three references.