Opportunity
North Carolina eVP #487-VCW DC Fast Chargers CRTPO
Engineering Design for Two 250 kW EV Fast-Charging Stations
Posted
November 17, 2026
Respond By
December 11, 2026
Identifier
487-VCW DC Fast Chargers CRTPO
NAICS
541320, 238210
Mecklenburg County is seeking engineering and design services for a four-vehicle EV fast-charging installation at the Valerie C. Woodard Center in Charlotte. - Buyer: Mecklenburg County; project location is the Valerie C. Woodard Center, Charlotte, North Carolina. NCDOT is involved through federal-aid funding; no buyer office or sub-agency is specified. - Requested project: Design for two 250 kW all-in-one DC fast-charging stations, configured to charge four EVs simultaneously and meet ADA requirements. No charger OEM, model, or supplier is specified. - Services: Surveying and plat preparation; planning and alternatives analysis; civil, electrical, structural, site, landscape, and lighting design; subsurface utility engineering; specifications, bid documents, cost estimates, and bidding support; utility and stakeholder coordination; geotechnical investigation, material testing, and storm-drainage design; permits and plan review; construction administration, inspection, commissioning, and closeout; and public engagement. Related plans may cover signage, pavement markings, erosion control, fire safety, surveillance, and emergency call boxes. - Requirements: Firms must be registered in North Carolina, have appropriately registered North Carolina Professional Engineers, and meet applicable NCDOT prequalification requirements, including work codes 222, 351, and/or 572. The project is partially supported by federal-aid funding and must meet applicable federal and NCDOT requirements. - Named organizations: Mecklenburg County, NCDOT, and Duke Real Estate (mentioned in connection with easement coordination). No engineering contractor or charger vendor is identified. - Performance: For the duration of the project, with additional services potentially requested on an as-needed basis. No specific start or end dates or option years are stated.
Description
Mecklenburg County is seeking Statements of Qualifications from firms or teams to provide professional engineering services for electric vehicle DC fast chargers at the Valerie C. Woodard Center in Charlotte. The project involves installing two 250 kW DC fast-charging stations, configured to charge four EVs simultaneously, and may include surveying, planning, design, bidding, construction administration, and related services. The contract will last for the duration of the project, with additional services available as needed, and will be partially reimbursed with federal-aid funding through NCDOT. Firms must meet the stated North Carolina registration and NCDOT prequalification requirements.